US$55 million from World Bank will be used for water and sanitation projects in Cambodia

The Royal Government of Cambodia has requested a loan of US$55 million from the World Bank to improve water supply and sanitation systems to benefit public health, sanitation in the city and to contribute to ensuring a clean environment, and living conditions of the people.

The project was revealed by the Ministry of Public Works and Transport in the first meeting of the steering committee for this project which was held at the Ministry office with the participation of the relevant ministries on 25 June 2020.

The project to improve the supply of water and sanitation in Cambodia under the US$55 million financing from the World Bank is divided into two main parts:

The first part focuses on the supply of clean water, and building new water supply systems in Sen Monorom in Mondulkiri province; Stung and Santuk districts in Kampong Thom province; Prasat Bakong and Sotun districts in Siem Reap province; Phnom Proek in Battambang province; and in Samaki Meanchey and Teuk Phos districts in Kampong Chhnang province.

The first part of the project will be implemented by the Ministry of Industry, Science, Technology and Innovation.

The second part of the project is hygiene oriented, with a focus on supporting the development and construction of a drainage network that will be connected to the current sewage system in Siem Reap, so that homes and businesses can connect directly to the whole sewage system in the city.

The second part is to be implemented by the Ministry of Public Works and Transport in Siem Reap town, Siem Reap province

Speaking on the subject, HE Kem Borey, Under Secretary of State of Ministry of Public Works and Transport, said: “We need to seek funding from development partners for the construction of sewerage, pumping and treatment system. Also, we need participation from our responsible citizens and their feeling of ownership with legal and regulatory standards, waste management, and collaborating with the private sector and strong operators’ capabilities.”

The project is expected to address issues related to wastewater quality standards from wastewater treatment stations, wastewater service pricing initiatives, incorporating wastewater service fees into the water supply bill, and improving service delivery, and also the management of manure from sewage sludge.

- Video Advertisement -

Related Post

Cambodia Implements EURO 5 Fuel Standards to Combat Air Pollution

In a significant move to tackle air pollution, the Royal Government of Cambodia has announced the implementation of EURO 5 fuel standards, set to take effect in 2025. This initiative aims to enhance air quality and protect public health by regulating fuel emissions. According to the official announcement, two key decisions have been made: the […]

Southeast Asia’s Coastal Real Estate Development Faces Critical Balance with Mangrove Conservation

A ground-breaking study reveals that 85% of Southeast Asia’s mangrove forests, which comprise 32 percent of global mangrove coverage and sequester 15.9 million tonnes of carbon dioxide annually, face severe risks from real estate development, agricultural expansion, and climate change impacts, according to new research led by University of Queensland researcher Valerie Kwan, as reported […]

Korean Firm Donates 8,000 Electric Motorbikes to Cambodian Government to Combat Emissions

In a significant move to address climate change, South Korean company VeryWords has pledged to donate 8,000 electric motorbikes to Cambodian government officials. This initiative aims to reduce greenhouse gas emissions in Cambodia and promote the use of environmentally friendly transportation. The announcement was made during a signing ceremony of a Memorandum of Understanding (MoU) […]

Cambodia’s Electricity Capacity Set to Expand Significantly by 2024

By 2024, Cambodia is poised to enhance its electricity generation capacity to an impressive 5,044 megawatts, alongside a substantial extension of transmission lines to 3,890 kilometers. During the closing ceremony of the Electricity Authority’s conference on 3 February 2025, HE Keo Rattanak, Minister of Mines and Energy, confirmed that these targets had been met. The […]

GeoStudio, the Future of Limit Equilibrium Analysis

By Louis Henry Prates Integrated geotechnical workflow Seequent’s vision is to provide a suite of underground solutions that seamlessly integrate into every stage of infrastructure development. Starting with field data collection and management with OpenGround, moving on to subsurface characterization and geological modeling with LeapFrog Works, and culminating in advanced Geotechnical Analysis with PLAXIS and […]

Chinese Company Pledges to Complete Mondulkiri Wind Power Station by 2026

In a significant commitment to renewable energy in Cambodia, HK OASIS Power Energy Development Co., Ltd. has vowed to complete the construction of a 150-megawatt wind power station in Mondulkiri province by 2026. This pledge was made by Mr Wang Junwei, the company’s representative, during a meeting with HE Chea Vuthy, Secretary General of the […]