Solutions for Rod Jamming

Have you had any experience of rod jamming during your drilling operation? There can be many factors; one is the collapse of the drilling hole; another is the cavity space inside the drilling hole. Furukawa, one of the leading rock drilling machinery producers can introduce some solutions and will explain details of these factors.

1. Drilling Hole Collapse:

Sometimes, the ground surface of the bench may be loose and fragile up to one or two metres in depth after blasting. In this case, the hole collapse often occurs during the drilling. As a result, several rocks fall off the wall of the hole. The falling rocks get stuck between the hole and the rod or bit. The rod gets jammed and cannot be pulled out. It is quite hard work to recover from the jamming and it robs your job and production of expensive and valuable time.

2. Cavity space inside drill hole:

If there are any cavities inside the hole during the drilling operation, it affects flushing performance. The cavity interrupts cutting rocks going outside of the hole. Because a lot of flushing blow power escapes into the space of cavity, it reduces power. As the result, a lot of cutting rocks cannot go outside of the hole and remain inside which results in the jamming of your rod. In addition, the cavity causes a hole deviation.

How to solve these problems? One solution is to use clay.

Tamp clay in the hole after drilling the first metre or around by collaring drilling Proceed to drill with no rod rotation by one metre or around.

Clay is pushed to the hole wall and it fixes the entrance of the hole and its wall. The fixed wall prevents any more collapse of the hole wall. It can be free from any stress of rod jamming caused by hole collapse.

If there are any cavities inside the hole, clay can help to fill the spaces and gaps of the cavity. As a result, the cavity disappears, and all flushing blow power can go outside of the hole straight and directly to achieve a smooth drill operation.

In case of no clay being available on the site, there are two ways to avoid these factors. One is to use water which also helps to fix the hole wall. Your drill may have a water tank and mist flushing system as optional equipment. The equipment supplies and sprays from the face of the bit through the rod. In the operator cabin of the drill machine, the drill operator can control spraying water to the hole.

Water is not effective itself against cavity problems but can be mixed with cutting dust, which is exhaust from the drill machine dust collector. The mixed material becomes like clay and can be put in the hole to fill the cavity space and fix the hole wall like clay.

These solutions are simple, but we believe they help a lot for daily operations. If rod jamming is reduced, the total drilling time becomes faster and productivity increases. When drilling suffers rod jamming caused by a hole collapse or cavity space, we recommend trying these solutions.

- Video Advertisement -

Related Post

Cambodia-ASEAN Trade Volume to Exceed USD 14 Billion in 2024

In 2024, the trade volume between Cambodia and ASEAN member countries surpasses USD 14.3 billion, marking a significant increase of 12.8% compared to the same period in 2023. This data comes from a recent report by the Ministry of Commerce. According to the report, Cambodia’s exports to ASEAN countries amounted to over USD 4.620 million, […]

Cambodia’s Steel Imports Surge by Nearly 70% in 2024

The construction sector in Cambodia is experiencing significant growth, as evidenced by the substantial increase in steel imports. In 2024, Cambodia imported over USD 631 million worth of steel, marking a remarkable 69.6 percent rise compared to the previous year’s imports of just over USD 372 million. This data was reported by the General Department […]

ISI Special Economic Zone Launches and Boosts Investment Growth in 2025

ISI Special Economic Zone, a new landmark development spanning over 800 hectares in Sihanoukville spearheaded by Cambodia’s esteemed ISI GROUP in collaboration with capital partners, is officially unveiled today during a grand launch ceremony at the ISI TOWER — ISI GROUP’s headquarters in Phnom Penh. (From left to right: Mr. Kang Sen, Executive Director of […]

Cambodia and Korea Strengthen Economic Partnership in 2024

The bilateral trade volume between Cambodia and the Republic of Korea has surged to USD 762 million by the end of 2024, marking an impressive increase of 11.49 percent compared to the previous year, according to a report from the Ministry of Commerce. Cambodia’s exports to Korea have reached USD 288 million, reflecting a robust […]

The rapid progress of riverbank construction in Kampong Cham has reached 65%

In a remarkable display of swift action and engineering prowess, the construction of a vital riverbank in the Srey Santhor district has surged ahead, reaching an impressive 65% completion in under a month. The Moan Dob Leu village project, Meanchey commune, commenced on December 23, 2024, following the alarming collapse of the Mekong River bank […]

Evercore Focuses on Clean Energy Investment in Cambodia

The Global investment banking firm Evercore is interested in investing in Cambodia’s clean energy sector. During a meeting on January 8, 2025, between Prime Minister Hun Manet and Evercore Asia President Keith Magnus, the firm also expressed interest in the country’s emerging sectors, including energy, health, and tourism. Magnus emphasized Evercore’s operations and its intention […]