Understanding Rules & Regulations on Construction Zone to Land Size Ratio

Many landowners often think that they build any constructions covering all the space of their land as long as they are still within their borders. However, it is illegal by law.

All constructions that require a construction permit must be built with spare land space between the construction and the land border to a specific distance depending on the type of the constructions, particularly those land plots located in capital, cities, and urban towns.

Sub-Decree No.42 on Urbanization of Capital Cities, Towns and Urban Areas has determined the legally required spare space between the building and land border based on types of construction as follows:

1. Low-rise buildings

Buildings with a ground floor to 2nd floor must have at least 4 metres of frontal space from the land border (or at least 2 metres if necessary for commercial and mixed-use areas), and at least 2 metres of back and side space.

2. Medium-rise buildings

3-8 floor buildings must have at least 4 metres frontal space (at least 2 metres if necessary for commercial and mixed-use areas), and 2 metres of back and side space.

9-11 floor buildings must have at least 5 metres of frontal space (at least 2.5 metres if necessary for commercial and mix-used areas), 2.5 metres of back and side space.

3. High-rise buildings

12 -20 floor buildings must have at least 6 metres of front space, and 3 metres of back and side space.

21-30 floor buildings must have at least 8 metres of front space, and 3.5 metres of back and side space

31-floors building and above must have at least 10 metres of front space, and 4 metres of back and side space

The abovementioned sub-decree also requires constructions located in commercial and mixed-use areas to have at least a 2-metre-wide walkway for pedestrians.

For land plots with existing space plans approved by the authorities, the construction owners must follow that specific space plans.

According to the sub-decree, keeping space between buildings and land borders will make it easier for government to do any future road expansion.

- Video Advertisement -

Related Post

Mondulkiri Authorities Launch Extensive Crackdown on Illegal Mining with 56 Sites Targeted

In an intensive crackdown spanning just three days, from 3 to 5 November 2024, the Mondulkiri Provincial Department of Mines and Energy, together with other local authorities, successfully intervened at 56 locations identified for illegal mining operations across Mondulkiri province. This major operation underscores Cambodia’s growing commitment to regulate mining activities and protect its natural […]

Cambodian Gov’t Extends Stamp Duty Exemption on Homes Up to USD 70,000 Until End of 2025

The Ministry of Economy and Finance has announced an extension of the stamp duty exemption for transferring ownership or possession of all types of borey housing valued at USD 70,000 or less, continuing this benefit until the end of 2025. This initiative aims to stimulate the real estate market by offering substantial tax relief to […]

Tycoon Ly Yong Phat’s Hydropower Company Suspended for Environmental Violations in Pursat & Koh Kong

The Ministry of Environment has temporarily suspended all activities of Stung Meteuk Hydropower, a company owned by Tycoon Ly Yong Phat, in Pursat and Koh Kong provinces due to multiple environmental violations and non-compliance with legal requirements. The suspension was confirmed in a letter from the ministry dated 2 September 2024. The decision stems from […]

South Korea’s Mugungwha Trust Targets Investment in Cambodia’s Expanding Trust Sector

Mugungwha Trust Co., Ltd., a leading South Korean trust company, has announced plans to invest in Cambodia’s trust sector, aiming to contribute to the country’s economic growth and sector expansion. The company’s President, Mr. Oh Chang-seok, expressed this commitment during a meeting with Samdech Techo Hun Sen on 10 September 2024 in Seoul, Republic of […]

GDT Sets Property Tax Deadline for 30 September 2024

The General Department of Taxation (GDT) has reminded all property owners to fulfil their property and land tax obligations by 30 September 2024. The announcement, made on 31 July 2024, , emphasises the critical importance of meeting this deadline to ensure a smooth tax collection process. To facilitate efficient tax payments, the GDT encourages property […]

Cambodian Senate Approves Landmark Air Transport Law to Boost Aviation Sector

In a significant move to bolster Cambodia’s aviation industry, the Senate has unanimously approved the draft law on international air transport. The approval, achieved with 56 out of 56 votes during the extraordinary session of the Senate of the 5th legislature, was held under the chairmanship of Samdech Techo Hun Sen on 31 July 2024. […]