What Technology Did Thailand Use to Build Its Underwater Train Tunnel?

Thailand recently revealed the completion of construction on the Samnam Chai underground train tunnel, which is the first ever train tunnel in Thailand to go beneath the Chaopaya River.

SCG, in cooperation with Ch Karnchang Plc, took Construction & Property Magazine on an exclusive tour into the tunnel to find out what technology are being applied in order to successfully build the tunnel.

Located 32 metres below ground level, Chanam Chai station is part of the 27-kilometre long MRT Blue Line extension connecting Bang Sue to Tha Phra and from Hua Lamphong to Bang Khae under the operation of the Mass Rapid Transit Authority of Thailand (MRTA).

Ch Karnchang was one of the five contractors assigned by the MRTA to build the Sanam Chai station and responsible for the 2.6 kilometre rail tunnel under the Chao Phraya River, where SCG was the concrete supplier to the project.

To achieve such a huge engineering challenge, modern manufacturing technology and strong, durable structures were required. In fact, engineering design plays a very important role, but the key and the most significant factor is the concrete.

Humidity and chemical elements in the soil such as seepage and the amount of sulfate and chloride were taken into consideration, as these directly affect the strength and durability of the structure.

Aggregate mixed into the concrete must also meet certain specifications beyond the normal required criteria such as size, cleanliness and strength.

SCG also took into consideration other specifications to ensure the lifespan of the structure, such as using the Alkali-Aggregate Reaction criterion to increase the durability of the concrete, prevent deterioration, and suitability for the usage.

There were various types of concrete used on the project:

1. Fast Setting Concrete – Special strength concrete sets faster than normal, is suitable for usage in projects with a limited construction timeframe such as roads and express ways.

2. Bored Pile Concrete – Improved formula concrete with bore piles. Reduced bleeding and higher durability and perfect for building underground.

3. High Early Strength Concrete – Extra-strong concrete that sets faster than normal and has less shrinkage. With reduced Alkali Silica reaction, the concrete is perfect for large infrastructure projects, allowing construction to be carried out faster.

4. Waterproof Concrete – Tightly packed concrete with high impervious and lower coefficient of permeability than normal concrete.

After starting construction on the project in 2011, Sanam Chai MRT station construction has been completed and is currently undergoing system installation. Sanam Chai Station as well as the whole project is expected to open for the public next year.

- Video Advertisement -

Related Post

Japan Pledges USD 900,000 for Bayon Temple Restoration: A Cultural Revival in Cambodia

To significantly boost cultural heritage preservation, the Royal Government of Japan has committed an additional grant of USD 900,000 for the Bayon Temple Preservation and Restoration Project. This funding will support a vital three-year initiative to revitalise this iconic landmark from 2025 to 2028. The announcement was made on December 13, 2024, during a plenary […]

Upgrade Your Roof Without Disruption: ISI RE-ROOFING Solutions

In Cambodia, many commercial properties face a common yet significant challenge: rust and water leakage in zinc roofs. This issue can severely disrupt daily operations in factories, warehouses, rice mills, and other businesses, leading to frequent repairs that drain time and resources. But what if there was a way to upgrade your roofing without the […]

The PropertyGuru Asia Real Estate Summit marks landmark 10th edition with aspirational discourses on future of cities

ARES 2024 ANCHORS PROPERTYGURU WEEK, FEATURING DEBUT OF THE MIDDLE EAST AWARDS AND OTHER MILESTONES BANGKOK, Thailand — The 10th edition of the PropertyGuru Asia Real Estate Summit (ARES), the thought leadership platform of PropertyGuru Group (NYSE: PGRU), gathered experts and thought leaders to discuss the intersecting issues moving and shaking the real estate industry, […]

Temporary Opening of Morodok Techo Flyover Ahead of Khmer New Year 2025

To enhance urban mobility and alleviate traffic congestion in the capital, the Cambodian government has temporarily opened the first floor of the much-anticipated “Morodok Techo” flyover before the Khmer New Year celebrations 2025. The construction of the flyover (Phase 2, Floor 1) has progressed significantly, reaching the concrete pouring stage on December 17, 2024. This […]

Cambodia Takes Bold Step to Embrace Informal Economy with New Digital Registration Platform

In a groundbreaking move to bolster the informal economy, the Royal Government of Cambodia, under the leadership of Prime Minister Hun Manet, has officially launched a digital platform aimed at registering informal economy businesses. Announced on December 16, 2024, this initiative sets forth two primary goals: to enhance awareness of the informal economy’s potential and […]

Hong Kong and Macau Plan Electric Motorcycle Assembly Plant in Cambodia, Boosting Green Transport Future

Investors from Hong Kong and Macau, China, have announced plans to establish an electric motorcycle assembly plant in Cambodia, a move poised to accelerate the country’s transition to eco-friendly transportation. The ambitious project was unveiled during a meeting on 13 December 2024 between HE Chea Vuthy, Secretary General of the Cambodian Investment Committee, and Mr […]