ADB Assists Cambodia on Energy Transition Programme

The Asian Development Bank (ADB) has approved a sector development programme that combines a US$50 million policy-based loan package with US$23 million in project investments to support the energy transition of Cambodia 

According to a press release issued on 15 December, the Energy Transition Sector Development Program includes ADB’s first comprehensive policy reform package for the energy sector in Cambodia, which will be funded by a US$40 million loan from ADB’s concessional resources and a US$10 million loan from the ASEAN Infrastructure Fund under its ASEAN Catalytic Green Finance Facility (ACGF). 

For the US$23 million in infrastructure investments, the Climate Investment Fund’s Scaling Up Renewable Energy Programme for Cambodia will provide a US$6 million loan and US$5 million grant in concessional climate finance, while the Green Climate Fund will extend a US$12 million loan through the ACGF Green Recovery Programme, all of which will be administered by ADB. 

The programme supports the Government of Cambodia’s energy transition agenda to mainstream renewable energy and energy efficiency while shifting away from fossil fuels. It adopts data-driven regulation and planning for the power system to enhance flexibility and resilience. It anchors new infrastructure investments on strategic planning while demonstrating new technologies and business models. 

The programme builds on key successes demonstrating the energy transition in action. The country’s first grid-connected solar photovoltaic system was driven by the private sector and financed by ADB in 2016. 

With further ADB support in 2018, the government prepared a solar master plan and launched Cambodia’s first solar park with a capacity of 100 megawatts in 2019 under a public–private partnership approach, which resulted in the lowest price for solar photovoltaic in the region at the time. 

Earlier this year, the government initiated the development of a 2-gigawatt solar plus storage procurement programme, which ADB also supports. 

- Video Advertisement -

Related Post

Borey Peng Huoth Announces Exclusive Pre-Sale Event for New Phum Nimith Project in Chbar Ampov

Early access to prime locations within the prestigious Grand Star Platinum development starting this March Following the successful groundbreaking ceremony held on January 30, 2026, Borey Peng Huoth is pleased to announce the official pre-sale launch of its newest residential development, Phum Nimith. This highly anticipated event will take place over three days from March […]

Accelerating Connectivity: Mekong River Bridge Connecting Dei Edth-Thmor Kor Surpasses 35% Completion

Minister Peng Ponea inspects the strategic infrastructure project in Kandal province to ensure rigorous technical standards and timely delivery for the public The construction of the major bridge across the Mekong River Dei Edth-Thmor Kor connecting Dei Edth commune in Kien Svay district to Thmor Kor commune in Lvea Em district has reached a significant […]

Cambodia and Laos to Fast-Track Cross-Border Connectivity with New Ratanakiri-Attapeu Road Link

Joint inspection team to finalize construction zones this February to unlock new trade and economic opportunities Cambodia and Laos have reached a pivotal agreement to conduct a joint technical inspection aimed at defining the specific zones for a new road project connecting Ratanakiri province in Cambodia to Attapeu province in Laos. This initiative is a […]

Kratie City Drainage and Pumping Station Project Surpasses 68% Completion

Provincial authorities and ADB-funded initiative accelerate infrastructure development to eliminate seasonal flooding and boost local economic appeal Kratie City is undergoing a significant infrastructural transformation as the construction of its comprehensive drainage network and rainwater pumping station reaches 68 percent completion. This development is a key sub-project of the Fourth Greater Mekong Subregion Corridor Towns […]

Border Ring Road Project in Mondulkiri and Ratanakiri Surpasses 72% Completion in 13 Months

Cambodia’s historic border ring road project has reached a significant milestone, achieving an overall completion rate of 72.29% as of January 11, 2026. This monumental initiative is being realized through the “Border Infrastructure Fund,” fueled by enthusiastic contributions from citizens across the country to strengthen national security and enhance the livelihoods of those living in […]

Advancing Cambodia’s Maritime Ambition: Sihanoukville Deep-Sea Terminal Reaches Significant Construction Milestone

Phase one of the new container terminal achieves nearly 60 percent completion as the government accelerates its vision for a regional logistics hub The construction of the first phase of the Sihanoukville new deep-sea container terminal has made substantial progress, reaching 57.40 percent completion as of early 2026. During a review of the construction site’s […]