Bentley Software Slashes Design Time for Major Philadelphia Park Project

Engineering firm Pennoni is transforming Philadelphia’s waterfront by building an 11.5-acre elevated park over the I-95 highway, successfully reconnecting the downtown area to the Delaware River.

Faced with complex terrain and the coordination of 21 subconsultants, the team turned to Bentley Systems software to streamline the massive undertaking.

The impact of the software suite was immediate and significant. By using OpenBridge Modeler, engineers automated the calculation of vertical clearances and complex geometries, cutting design hours for bridge landscaping and utility routing by 50%.

The firm also utilized RAM Elements for specialized structural analysis, which accelerated the design of a complex domed breezeway by 300% and completely eliminated manual calculation time for the project’s café and transfer platforms.

Beyond speed, the digital modeling tools improved cost estimate accuracy by 25% and supported the creation of a sustainable, LEED Platinum-targeted space. The finished project will feature Philadelphia’s first mass timber public structure and convert six acres into pervious surfaces with over 56,000 new plants.

In total, the efficiency gained through Bentley’s applications saved the project 45,000 labor hours, proving that advanced digital workflows are essential for modern, sustainable urban engineering.

- Video Advertisement -

Related Post

Connecting the Subsurface and Beyond: How Bentley Systems is Revolutionizing Infrastructure Collaboration

Infrastructure data has traditionally lived in silos—scattered across 3D models, PDF blueprints, inspection reports, field photos, and IoT sensors. For project teams, bringing these disparate pieces together has long been a complex and fragmented challenge. Addressing this industry-wide hurdle, Bentley Systems has announced the launch of Bentley Infrastructure Cloud Connect, a foundational new layer designed […]

Transforming Infrastructure: How Bentley Systems is Spearheading the AI Revolution

As global urbanization accelerates and the demand for resilient infrastructure surges, the engineering capacity gap remains one of the industry’s greatest hurdles. To address this challenge, Bentley Systems has unveiled a groundbreaking suite of next-generation, AI-powered capabilities designed to empower professionals rather than replace them. Grounded in real-world infrastructure context, these innovations aim to dramatically […]

Bentley announces the Bentley Technology Summit to be held in Toronto, Canada

As urbanization accelerates and the demands on global infrastructure reach unprecedented heights, the industry stands at a major turning point. From managing complex subterranean geology for major metropolitan transit lines—like Vienna’s ambitious metro expansion using advanced 3D subsurface models—to navigating new paradigms in artificial intelligence and connected data, modern civil engineering is undergoing a massive […]

How a 3D Underground Model is Shaping Vienna’s Transit Future

As Vienna’s population continues to surge and tourism hits record-breaking highs, the Austrian capital is looking downward to secure its future. The city is currently boring a brand-new metro line through some of the trickiest, most varied geological terrain in Europe—guided by an innovative 3D subsurface model that began, fittingly, on a rooftop. A Legacy […]

Bentley’s Year in Infrastructure Awards Opens in Singapore With a New Format, New Host, and 36 Finalists

The people shaping the world’s infrastructure deserve an experience as extraordinary as the work they do. This year, Bentley built one. Bentley’s Year in Infrastructure Awards opened in Singapore with a new look. Now in its 22nd year, the event often called the “Oscars of Infrastructure” has a new host, a new keynote format, and […]

PLAXIS 2D Helps Model Madrid’s Traditional Tunnel Construction Method

Engineers have developed a methodology using PLAXIS 2D to simulate tunnels built with the Traditional Method of Madrid (TMM), offering a faster alternative to complex three-dimensional analyses. Used in the Madrid Metro since 1917, the TMM divides tunnel excavation into small sections, typically less than 5 square meters. Each section is temporarily supported with timber […]