Cambodia’s Largest Water Reservoir Project Reaches 40% Completion in Pursat

Cambodia is constructing what is set to become the nation’s largest water storage facility, Reservoir Dam Development Project No. 2, in Pursat Province, an immense infrastructure project designed to secure water for agriculture and bolster flood control. As of late November 2025, the construction of the facility has reached approximately 40% completion.

The project, which began construction in January 2025, is located on the Pramoy River in Rokat Commune, Phnom Kravanh District, Pursat. Upon its scheduled completion in December 2027, the reservoir is anticipated to hold a massive 860 million cubic meters of water, officially making it the largest water reservoir in the country.

Prime Minister Hun Manet announced the progress on his social media page on November 24, 2025, detailing the project’s critical role in enhancing national water security.

The reservoir is engineered to provide four major benefits to the region:

  1. Massive Irrigation: The 860 million cubic meter capacity will be leveraged to irrigate approximately 262,500 hectares of farmland. This expansion is expected to stabilize and strengthen agricultural yields throughout both the dry and rainy seasons, supporting the expansion of the agricultural sector and contributing to overall food security.
  2. Flood Mitigation: A key design objective is to regulate water flow and substantially mitigate recurrent seasonal flooding in downstream areas of Pursat province, which have historically suffered significant damage.
  3. Infrastructure Protection: By controlling the Pramoy River’s water levels, the dam will reduce stress on and damage to crucial local irrigation systems and essential public infrastructure.
  4. Eco-Tourism: Once completed, the reservoir area is expected to spur local economic activity by developing into a natural eco-tourism destination.

The approximately $100 million project is positioned as a major national asset, enhancing Cambodia’s resilience to climate change and supporting sustainable development for rural communities.

- Video Advertisement -

Related Post

Progress Update on the Stung Khliech Water Resources Development Project in Kampong Speu

Strategic irrigation infrastructure reaches fifteen percent completion milestone to support forty thousand hectares of farmland The Stung Khliech Water Resources Development Project in Kampong Speu province has reached a fifteen percent completion rate in its construction phase. Once finished, this significant infrastructure project will have the capacity to provide irrigation for approximately 40,000 hectares of […]

Borey Peng Huoth Announces Exclusive Pre-Sale Event for New Phum Nimith Project in Chbar Ampov

Early access to prime locations within the prestigious Grand Star Platinum development starting this March Following the successful groundbreaking ceremony held on January 30, 2026, Borey Peng Huoth is pleased to announce the official pre-sale launch of its newest residential development, Phum Nimith. This highly anticipated event will take place over three days from March […]

Accelerating Connectivity: Mekong River Bridge Connecting Dei Edth-Thmor Kor Surpasses 35% Completion

Minister Peng Ponea inspects the strategic infrastructure project in Kandal province to ensure rigorous technical standards and timely delivery for the public The construction of the major bridge across the Mekong River Dei Edth-Thmor Kor connecting Dei Edth commune in Kien Svay district to Thmor Kor commune in Lvea Em district has reached a significant […]

Cambodia and Laos to Fast-Track Cross-Border Connectivity with New Ratanakiri-Attapeu Road Link

Joint inspection team to finalize construction zones this February to unlock new trade and economic opportunities Cambodia and Laos have reached a pivotal agreement to conduct a joint technical inspection aimed at defining the specific zones for a new road project connecting Ratanakiri province in Cambodia to Attapeu province in Laos. This initiative is a […]

Kratie City Drainage and Pumping Station Project Surpasses 68% Completion

Provincial authorities and ADB-funded initiative accelerate infrastructure development to eliminate seasonal flooding and boost local economic appeal Kratie City is undergoing a significant infrastructural transformation as the construction of its comprehensive drainage network and rainwater pumping station reaches 68 percent completion. This development is a key sub-project of the Fourth Greater Mekong Subregion Corridor Towns […]

Border Ring Road Project in Mondulkiri and Ratanakiri Surpasses 72% Completion in 13 Months

Cambodia’s historic border ring road project has reached a significant milestone, achieving an overall completion rate of 72.29% as of January 11, 2026. This monumental initiative is being realized through the “Border Infrastructure Fund,” fueled by enthusiastic contributions from citizens across the country to strengthen national security and enhance the livelihoods of those living in […]