Siem Reap Provincial Authority Announce Immediate Demolition of Buildings Along Eight Roads to Prepare for New Road Construction

The Siem Reap Provincial Authority has ordered all owners to immediately demolish any buildings along eight roads in Siem Reap City within 15 days from the date of this announcement, and will soon start construction projects on these roads, according to an announcement dated on 23 June 2022.

All business buildings, houses, constructions, and other properties that are affected and, on the land, along the eight roads must be demolished by the determination, which is measured and marked by the decision of the Administrative Commission during Systematic Land Registration (LMAP).

The authority will construct these eight roads using government funding including:

  1. The road behind Pur Langkar Pagoda (In front of Hang Trop Hotel) to Boengdonpa Concrete Road 670, which is 670 metres × 6 metres with a 1-metre diameter drain in a 670-metre-long road.
  2. Slaughter Road (Sangkat Chreav) from the ring road to Khnar Chas Road, which is 2330 metres × 7 metres with 6 drains crossing the road 12 metres​ apart.
  3. Ice Factory Road (Sangkat Chreav) from the ring road to the East direction, which is 860 metres × 7 metres with 0.8-metre diameter drains along the 1720-metre-long road.
  4. Phum Kuk Krasang Road (Sangkat Svay Dankum) from Provincial Road 267 (gate of Sun Boutique to the road to Stueng America), which is 800 metres × 7 metres with drains on both sides of road with a diameter of 0.8 metres and a length of 500 metres.
  5. National Road 6 (Chao Sang Hok) to the South, which is 170 metres × 6 metres with 0.8-metre diameter drains.
  6. National Road 6 (Total Phsar Leu) to Ta Uch Road, which is 360 metres × 7 metres with 0.8-metre diameter drains in the centre of the road.
  7. Road near Mondial Restaurant to the North, which is 720 metres × 6 metres and 0.8 metres in diameter of the drain with 720 metres long in the centre of the road.
  8. North Road of Wat Brasat Tramneak with 0.8-metre diameter drains.

After the expiration of 15 days, the Siem Reap Provincial Authority will demolish any buildings according to the legal procedures in force and will not be responsible for any damage or loss of properties in case all construction owners do not comply with this announcement.

- Video Advertisement -

Related Post

Cambodia officially Withdraws from CLV Development Triangle

In a significant move, the Cambodian government has officially announced its withdrawal from the Cambodia-Laos-Vietnam Development Triangle Area (CLV-DTA). This decision was formalized by promulgating the Law on the Approval of the Agreement on the Promotion and Facilitation of Trade in the CLV-DTA, marking a new chapter in Cambodia’s regional engagement. The law will take […]

Mondulkiri Authorities Launch Extensive Crackdown on Illegal Mining with 56 Sites Targeted

In an intensive crackdown spanning just three days, from 3 to 5 November 2024, the Mondulkiri Provincial Department of Mines and Energy, together with other local authorities, successfully intervened at 56 locations identified for illegal mining operations across Mondulkiri province. This major operation underscores Cambodia’s growing commitment to regulate mining activities and protect its natural […]

Cambodian Gov’t Extends Stamp Duty Exemption on Homes Up to USD 70,000 Until End of 2025

The Ministry of Economy and Finance has announced an extension of the stamp duty exemption for transferring ownership or possession of all types of borey housing valued at USD 70,000 or less, continuing this benefit until the end of 2025. This initiative aims to stimulate the real estate market by offering substantial tax relief to […]

Tycoon Ly Yong Phat’s Hydropower Company Suspended for Environmental Violations in Pursat & Koh Kong

The Ministry of Environment has temporarily suspended all activities of Stung Meteuk Hydropower, a company owned by Tycoon Ly Yong Phat, in Pursat and Koh Kong provinces due to multiple environmental violations and non-compliance with legal requirements. The suspension was confirmed in a letter from the ministry dated 2 September 2024. The decision stems from […]

South Korea’s Mugungwha Trust Targets Investment in Cambodia’s Expanding Trust Sector

Mugungwha Trust Co., Ltd., a leading South Korean trust company, has announced plans to invest in Cambodia’s trust sector, aiming to contribute to the country’s economic growth and sector expansion. The company’s President, Mr. Oh Chang-seok, expressed this commitment during a meeting with Samdech Techo Hun Sen on 10 September 2024 in Seoul, Republic of […]

GDT Sets Property Tax Deadline for 30 September 2024

The General Department of Taxation (GDT) has reminded all property owners to fulfil their property and land tax obligations by 30 September 2024. The announcement, made on 31 July 2024, , emphasises the critical importance of meeting this deadline to ensure a smooth tax collection process. To facilitate efficient tax payments, the GDT encourages property […]