Thai Firm Invests in 30MW Solar Project in Banteay Meanchey

Ministry of Mines and Energy is checking the legal procedure on a share purchase agreement of a 30 MW solar project in Banteay Meanchey province.

The checking has been made after Thai firm B.Grimm entered into a share purchase agreement to acquire all shares in Ray Power Supply Co., Ltd, with the total share value of US$300,000, according to PV Tech website.

Under the agreement, the B. Grimm will install the ground-mount system covering 40 hectares of land in Banteay Meanchey Province.

The deal provides B. Grimm with the right to develop the photovoltaic project pursuant to a 20-year power purchase agreement with national utility Electricite Du Cambodge.

The project is scheduled for completion by October 2020 and the whole project is scheduled to generate power in 2021.

The share purchase agreement is required for approval by the Ministry of Mines and Energy and relevant authorities of Cambodia.

Victor Jona, director general of Energy and spokesman at Ministry of Mine and Energy, said that the ministry has received the share transfer document and now starts the legal procedure checking on the share transfer.

“The share purchase agreement has been made successful already on the technical basic, but for legal procedure, it is needed to approval from the authorities,” Mr Jona said.

According to Mr Jona, the share purchase agreement of investment projects are not harm to the overall those projects and there have been similar cases so far.

Currently, the existing two solar projects generate 90MW to the grid and the government sets at least 410MW with recently-approved 7 solar projects will be generated cumulatively by 2020.

- Video Advertisement -

Related Post

Battambang Launches Strategic Urban Infrastructure Project on Street 154

Extensive road expansion and drainage system upgrades in Wat Kor Sangkat signal the start of a city-wide modernization initiative The Battambang Provincial Administration has officially broken ground on a comprehensive infrastructure project in Battambang City, focusing on road restoration and the construction of advanced drainage systems. The ceremony, held on March 9, 2026, was led […]

Cambodia and South Korea Explore Small-Scale Hydropower Potential at Dauntri and Reaksa Reservoirs

Joint feasibility study focuses on integrating renewable energy and solar power to secure sustainable water and electricity supplies for local communities The Ministry of Water Resources and Meteorology has partnered with the Korea Water Resources Corporation, known as K-water, to conduct a comprehensive feasibility study on the installation of small-scale hydropower facilities at the Dauntri […]

Borey Peng Huoth Announces Exclusive Pre-Sale Event for New Phum Nimith Project in Chbar Ampov

Early access to prime locations within the prestigious Grand Star Platinum development starting this March Following the successful groundbreaking ceremony held on January 30, 2026, Borey Peng Huoth is pleased to announce the official pre-sale launch of its newest residential development, Phum Nimith. This highly anticipated event will take place over three days from March […]

Accelerating Connectivity: Mekong River Bridge Connecting Dei Edth-Thmor Kor Surpasses 35% Completion

Minister Peng Ponea inspects the strategic infrastructure project in Kandal province to ensure rigorous technical standards and timely delivery for the public The construction of the major bridge across the Mekong River Dei Edth-Thmor Kor connecting Dei Edth commune in Kien Svay district to Thmor Kor commune in Lvea Em district has reached a significant […]

Cambodia and Laos to Fast-Track Cross-Border Connectivity with New Ratanakiri-Attapeu Road Link

Joint inspection team to finalize construction zones this February to unlock new trade and economic opportunities Cambodia and Laos have reached a pivotal agreement to conduct a joint technical inspection aimed at defining the specific zones for a new road project connecting Ratanakiri province in Cambodia to Attapeu province in Laos. This initiative is a […]

Kratie City Drainage and Pumping Station Project Surpasses 68% Completion

Provincial authorities and ADB-funded initiative accelerate infrastructure development to eliminate seasonal flooding and boost local economic appeal Kratie City is undergoing a significant infrastructural transformation as the construction of its comprehensive drainage network and rainwater pumping station reaches 68 percent completion. This development is a key sub-project of the Fourth Greater Mekong Subregion Corridor Towns […]