Kingdom’s First Expressway Opened for Traffic, Second Set to Begin Construction in 2023

The 187km Phnom Penh-Sihanoukville expressway, the first of its kind in Cambodia, opened for traffic on 1 October with a 1-month toll-free trial, marking a major achievement in infrastructure development.

The route will play a key role in boosting the country’s logistical efficiency by reducing the time and costs involved in the transportation of goods. The expressway cuts the commuting time between the two economic poles of the country, Phnom Penh and Sihanoukville, from 5-6 hours to only over 2 hours.

Fully paved with asphalt concrete, the road is two lanes wide in each direction plus a side lane for emergency use on each shoulder. From 1-7 October, the total traffic volume on the Phnom Penh-Sihanoukville Expressway reached 80,231 vehicles. On average, the daily traffic volume was about 11,460.

With ground broken in March 2019, this major infrastructure project was undertaken by China Road and Bridge Corporation (CRBC) with an investment of over US$2 billion under a build-operate-transfer scheme for 50 years.

The company used US$600 million of its own funds while the remaining US$1.4 billion came in the form of loans from China Bank. In addition, the project also used US$150 million in grant aid from the People’s Republic of China.

“The project is one thing we hope will push our economic poles connecting Phnom Penh and Cambodia’s coast to become a gateway of economic growth, that is what we want it to be,” said Prime Minister Hun Seun during the ground-breaking.

Besides this project, the Cambodian government will soon build a second expressway connecting Phnom Penh to the Vietnamese border Bavet city.

According to preliminary studies, the Phnom Penh-Bavet Expressway would have a total length of 135km crossing through Kandal, Prey Veng, and Svay Rieng provinces before reaching the Cambodia-Vietnam Bavet border gate.

The Cambodian government have already signed a Memorandum of Understanding (MoU) with CRBC. The company will study and prepare to sign the concession agreement this year to start construction by mid-2023, according to Minister of Public Works and Transport HE Sun Chanthol.

Cambodia and Vietnam have also already signed an agreement on the connection point between Cambodia’s Phnom Penh-Bavet expressway and Vietnam’s Moc Bai-HCMC expressway. The Vietnamese side will also soon start the construction of the Moc Bai-HCMC expressway.

An inter-ministerial committee was also established to accelerate the work with HE Sun Chanthol, Senior Minister, Minister of Public Works and Transport, appointed as Chairman. Three senior officials from relevant ministries have been appointed as three deputy chairmen along with other 15 members.

This inter-ministerial committee is tasked to review and advise on the procedures, legal framework, and overall view of the investment in the Phnom Penh-Bavet expressway project.

 

 

 

 

 

- Video Advertisement -

Related Post

Cambodia Road Network Expands to Over 20,000 Kilometers in 2025

Strategic infrastructure development adds 426 kilometers to the national network to boost logistics and economic growth The total length of developed roads in Cambodia reached 20,733.91 kilometers by the end of 2025, marking a notable increase of approximately 426.32 kilometers compared to the previous year. This data was highlighted in the 2025 Annual Progress Report […]

Cambodia and Laos to Fast-Track Cross-Border Connectivity with New Ratanakiri-Attapeu Road Link

Joint inspection team to finalize construction zones this February to unlock new trade and economic opportunities Cambodia and Laos have reached a pivotal agreement to conduct a joint technical inspection aimed at defining the specific zones for a new road project connecting Ratanakiri province in Cambodia to Attapeu province in Laos. This initiative is a […]

Pursat Provincial Authorities Inaugurate New Bridge and Kick Off Construction of Nine Rural Roads

In a significant boost to local infrastructure, the Royal Government of Cambodia officially inaugurated a new 75-meter concrete bridge and announced the construction of nine additional rural roads in Pursat Province. The ceremony presided over by His Excellency Chhay Rithsen, Minister of Rural Development, marked a milestone for the community. The newly inaugurated bridge, connecting […]

Bassac River Bridge in Chak Angre Krom–Prek Pra Reaches 51% Completion

As of October 28, 2025, construction of the Bassac River Crossing Bridge connecting Chak Angre Krom to Prek Pra has reached 51% completion, according to the Ministry of Public Works and Transport (MPWT). A recent on-site inspection led by His Excellency Suong Heng, Secretary of State and Project Director, revealed steady progress across key construction […]

National Road 23 Fully Completed, Boosting Connectivity and Regional Growth

The Ministry of Public Works and Transport has officially announced the full completion of the National Road 23 (NR23) upgrade, marking a significant achievement in Cambodia’s ongoing infrastructure development. The announcement was made on October 24, 2025, following the completion of a 19.8-kilometer section designed to improve transportation efficiency and accessibility for local residents. The […]

Kampong Chhnang Province Celebrates Groundbreaking of Six Major Roads Enhancing Rural Development

In a significant step towards improving rural infrastructure, the Ministry of Rural Development held a groundbreaking ceremony today for the construction of six roads spanning over 40.5 kilometers. The event took place in the Teuk Phos and Kampong Tralach districts, with His Excellency Chhay Rithsen, the Minister of the Ministry of Rural Development, presiding over […]