Over 1,000km of Road Built in Kratie in Past 5 Years; 400km Require Maintenance

Kratie province has a total of 1,190.42km of physical infrastructure, while 31 rural roads with a length of 480.90km are regularly maintained, according to a press conference on 31 January. 

Of all the under-maintenance infrastructure, 399.11km are AC roads, 3.11km are concrete roads and 788.20 km are gravel roads. There are also 138 bridges with a length of 4.6km and a total of 1,256 drainages with a total length of 51km. 

In 2022, the Provincial Department of Public Works and Transport completed the maintenance of 13.80km of paved roads, and 16 metres of all kinds of drainage, including 50 regular road maintenance work on 1,075.25 km. 

31 roads with a length of 480.90km are also regularly maintained. 

In 2022, the province also completed the construction of four 84km DBST rural roads in Sambo and Chit Borei districts. 

- Video Advertisement -

Related Post

Kampong Speu Irrigation Projects Nearing Completion: Roleang Chrey Canal at 60%, Tasal Reservoir at 90%

Significant progress has been made on critical irrigation projects in Kampong Speu province, according to an inspection visit by H.E. Bun Hean, Secretary of State and Chairman of the Project Inspection Unit of the Ministry of Water Resources and Meteorology, on 15 May 2024. The rehabilitation of the Tasal Reservoir and the North Roleang Chrey […]

Australia Pours US$6.6 Million into Cambodia’s Water Development Fund

In a significant move to bolster Cambodia’s water infrastructure and management capabilities, Australia has pledged AUD10 million (US$6.6 million) to establish a dedicated water development fund, according to a meeting held on 13 May 2024 between Mr. Hem Vandy, Cambodia’s Minister of Industry, Science, Technology and Innovation, and Mr. Pablo Kang, Chargé d’Affaires of the […]

A New Frontier for Conservation: US$520K Canal Project to Shield Techo Sen Russey Trep National Park

In a significant conservation effort, the Royal Academy of Cambodia unveiled plans on 5 May 2024 for the construction of a 52-kilometre-long canal to safeguard the expansive Techo Sen Russey Trep National Park. Spanning 6 meters in width and 2.5 meters in depth, this ambitious US$520,000 project aims to encircle and protect over 10,000 hectares […]

49km of Kratie Province Roads Revitalization Hits Midway Mark: A 53% Completion in Infrastructure Enhancement

As of 8 May 2024, the Kratie Provincial Administration has reported a significant milestone in the enhancement of its transportation infrastructure, with the rehabilitation project of two main provincial roads reaching approximately 53% completion. Spanning nearly 49 km, Provincial Road No. 377 and Road 377A are undergoing extensive improvements to bolster the quality and maintenance […]

Revitalizing Kampot: AZ Group to Invest Up to US$10M in International Tourist Port

AZ Builder, a subsidiary of the prominent Cambodian AZ GROUP, is set to invest between US$ 5 million and US$ 10 million in the rehabilitation of the Kampot International Tourist Port, a project that has faced delays since its inception in 2022. This strategic investment aims to rejuvenate the port, enhancing its accessibility for ships […]

Kratie’s Mekong River Bridges Approach Halfway Mark in $111 Million Project

The ambitious project to construct bridges across the Mekong River in Kratie province, valued at US$111 million,  has surged ahead, with completion surpassing 49% as of early May 2024 while the road connection component stands at an impressive 36.24%. This milestone was confirmed by the Ministry of Public Works and Transport’s official Facebook page on […]