The 3rd Wastewater Treatment Plant in SHV completes 98%, scheduled to end this July

The third-largest wastewater treatment plant (PS3) in Sihanoukville, located in Village 4, Sangkat 4, is on the verge of completion, achieving an impressive 98% progress as of July 11, 2023. The construction, scheduled to conclude by the end of July 2023, signifies a significant milestone in the province’s commitment to environmental sustainability and efficient wastewater management.

HE Kouch Chamroeun, Governor of Preah Sihanouk Province, recently inspected the site and confirmed the remarkable progress. X.WATER, the representative of the project, stated that the wastewater treatment plant is currently at the final stages of preparation for testing, set to take place by the end of July 2023.

With a daily capacity of 20,000 cubic meters, the plant will utilize the advanced MABR technology to purify wastewater in accordance with environmental standards. The innovative system ensures high efficiency, energy-saving operations, and a minimal impact on the surrounding environment, free from noise and odors.

Sihanoukville Province has already established two wastewater treatment plants, which are successfully operational. The first plant has a capacity to treat 5,200 cubic meters of wastewater per day, serving the third area spanning 364 hectares in Sangkat 3. The second plant, catering to the fourth area covering 486 hectares in Sangkat 3, has a treatment capacity of 7,200 cubic meters per day.

The upcoming completion of the PS3 wastewater treatment plant, standing at an impressive 98% progress, showcases the province’s dedication to environmental preservation and sustainable development. The plant, with an investment of US$20 million, commenced operations on September 17, 2021. It will play a crucial role in filtering and treating 20,000 cubic meters of wastewater per day, significantly contributing to the enhancement of the region’s ecological well-being. (Read more)

Furthermore, Sihanoukville boasts seven additional wastewater pumping stations, four of which were constructed by the National Committee for Coastal Management and Development of Cambodia, while three were commissioned by the Ministry of Public Works and Transport. These pumping stations effectively transport wastewater to the Sihanoukville wastewater treatment plant, covering a vast area of 16 hectares.

 

 

- Video Advertisement -

Related Post

Brunei’s Khazanah Nasional Targets Multi-Sector Infrastructure Investment in Cambodia

Khazanah Nasional Berhad, a leading investment firm from Brunei Darussalam, has announced plans to explore infrastructure investment opportunities in Cambodia, focusing on health, water resources, transport infrastructure (including railways and airports), and banking. This initiative was discussed during a meeting between PM Hun Manet and Khazanah’s CEO, Mr. Dato Khairul Hamed, on 19 November 2024. […]

China Construction America Ordered to Pay US$1.6 Billion and Conflict of Political Interests Behind

A New York court has ordered China Construction America Inc. (CCA), a subsidiary of Chinese state-owned China State Construction Engineering, to pay US$1.6 billion to BML Properties, the original owner of the Baha Mar casino resort in the Bahamas, after the contractor was found to have committed “many acts of fraud” during its takeover of […]

Phnom Penh-SHV Expressway Offers Exclusive Discounts for 3-Day Water Festival Celebration

To celebrate the Royal Water Festival from 14 to 16 November 2024, the Ministry of Public Works and Transport (MPWT) has announced a special three-day discount on the Phnom Penh-Sihanoukville Expressway. Notification No. 052 S.K.R., dated 12 November 2024, confirmed that the Phnom Penh-Sihanoukville Expressway Company will offer a 20% discount on toll fees for […]

Groundbreaking of 500-Hectare Green Textile Industrial Park in Kampong Speu to Create Up to 60K Jobs

A groundbreaking ceremony on 8 November 2024 marked the start of a 500-hectare green textile industrial park in Chheu Neang Village, Taing Sya Commune, Phnom Sruoch District, Kampong Speu. Attended by HE Heng Sour, Minister of Labor and Vocational Training, HE Dr. Cheam Chansophoan, Governor of Kampong Speu Province, and Mr. John Yu, Chairman of […]

PM Inaugurates USD10 Million Techo Santepheap Ankoul Beach Road to Boost Tourism in Kep

The USD10 million Techo Santepheap Ankoul Road project, aimed at enhancing tourism infrastructure, was officially inaugurated in Ang Kol, Kep Village, and Angkor Village within the Ang Koul Commune of Damnak Chang Eur District, Kep Province. Led by PM Samdech Hun Manet, the ceremony on 11 November 2024 marked the completion of this pivotal project […]

NR No. 33 (Kampot-Chrak Lok) Reaches 99% Completion, Strengthening Provincial Transport Network

NR No. 33, connecting Kampot to Chrak Lok, is on the cusp of completion, with an impressive 98.89% of the project finalised as of early November 2024. This achievement was highlighted in an official inspection conducted on 6 November 2024 by HE Pal Chandara, Secretary of State of the Ministry of Public Works and Transport, […]