Irrigation Rehabilitation Project in Southwest Phnom Penh Reaches 25% Completion

The extensive rehabilitation project aimed at enhancing the irrigation and drainage systems in Kampong Speu, Takeo, and Kandal provinces has reached 25% completion, as confirmed by HE Pich Veasna, Undersecretary of State at the Ministry of Water Resources and Meteorology, on 22 August 2024. This milestone was announced during an inspection of the project’s progress, conducted alongside the JICA High-Level Delegation and other stakeholders.

This critical project encompasses the Roleang Chrey Irrigation System in Chbar Morn City and Samrong Tong district, Kampong Speu Province, as well as the Kandal Stung-Bati Irrigation System spanning Kandal Steung district in Kandal Province and Bati district in Takeo province. The ongoing construction is part of a broader initiative funded through concessional financing from the Royal Government of Japan. (Read more)

HE Pich Veasna emphasised the importance of prioritising the safety of workers and local residents throughout the project’s duration. Additionally, he instructed the project’s Technical Advisor and the construction company to ensure that machinery and materials were adequately prepared to mitigate flood risks in Stung Prek Tnaot.

Upon completion, the Roleang Chrey irrigation system will have the capacity to irrigate 16,910 hectares of rice paddies twice a year, alongside 1,500 hectares of dry rice. Meanwhile, the Stung-Bati irrigation system is expected to provide irrigation water three times a year, significantly increasing the cultivation of rain-fed rice by approximately 1,200 hectares, wet-season rice by 2,011 hectares, and dry-season rice by 400 hectares.

- Video Advertisement -

Related Post

Twin Flyovers Near Completion at Phnom Penh-Kandal Border

  The construction of the Samdech Thipadei Hun Manet flyover, connecting Phnom Penh and Kandal province, has reached an impressive milestone with 85% of the project completed. The latest update comes as the twin flyovers advance toward the final stages of construction. A significant ceremony marking the connection of the bridge body was held on […]

Major Infrastructure Project Nears Completion in Siem Reap

A significant infrastructure development is underway in Siem Reap province, with a 15-kilometer road connecting National Road 6 to the Kampong Phluok tourist area now approximately 70% complete, according to an announcement from the Siem Reap administration. This vital roadway, which measures 8 meters in width, is part of a project initiated by Prime Minister […]

Japan’s JBIC Eyes Partnership for Major Infrastructure Development in Cambodia

The Japan Bank for International Cooperation (JBIC) has showcased a strong interest in collaborating on significant infrastructure projects in Cambodia. This development was announced following a meeting between Prime Minister Hun Manet and JBIC President and CEO Maeda Tadashi on May 28, 2025. During their discussions, President Maeda emphasized JBIC’s commitment to fostering partnerships with […]

The Government Announces New Opening Date for Techo International Airport

In a significant new update for travelers and the aviation industry, the State Secretariat of Civil Aviation has announced a revised opening date for the much-anticipated Techo International Airport in Takhmao. Originally set to open on July 10, 2025, the grand opening is now scheduled for September 9, 2025, as indicated in a notice issued […]

National Road 10 Completed: Enhancing Regional Connectivity

The construction of National Road 10, stretching over 197.36 kilometers, has been officially completed, marking a significant milestone in the region’s infrastructure development. The road is now fully operational and has undergone a thorough inspection by a team of skilled technicians to ensure its longevity and adherence to technical standards. A detailed assessment was conducted […]

Singapore Resumes Construction of Changi Airport’s Largest Passenger Terminal After Pandemic Delay

In a significant milestone for Singapore’s aviation sector, the construction of Terminal 5 (T5) at Changi Airport has officially commenced following a two-year pause brought on by the COVID-19 pandemic. The groundbreaking ceremony, which took place on May 14, 2025, was graced by Prime Minister Lawrence Wong. Prime Minister Wong highlighted that the new terminal […]