Turkey breaks world record of having longest suspension bridge

The world’s longest suspension bridge was put into use in Turkey in earlier March, making Turkey take the title from Japan (Akashi Kaikyo Bridge) for having the world’s longest suspension bridge. Named 1915 Çanakkale Bridge, this bridge was built cross over the Dardanelles Waterway in Turkey, stretching over 2,023 meters long, according to the Time […]

Read More

South Korea to help build another US$16-million hospital building in Cambodia

The South Korean government, through the Korea International Cooperation Agency (KOICA), plans to build a new five-storey treatment building worth US$16 million in the National Pediatric Hospital to provide better medical service to Cambodian children. Director of the National Pediatric Hospital Dr Nheb Angkeabos unveiled this new South Korea-funded project during the official visit to […]

Read More

Opening of Dara Sakor Airport in Koh Kong Postponed to Mid-2022

The operation date of the Dara Sakor International Airport in Koh Kong province has been postponed until mid-2022, according to the State Secretariat of Civil Aviation (SSCA). Dara Sakor International Airport reportedly announced in late 2021 that it would start trial operations in early 2022, as the construction of the airport’s major infrastructure is nearing […]

Read More

Ground Broken on Chinese-Funded Auditorium Building at Cambodia’s Army Institute

The construction of a China-funded 5-storey auditorium building at the Cambodian Royal Army Institute in Phnom Sruoch district in Kampong Speu province has officially begun. The ground-breaking ceremony was held on 28 March by General Vong Pisen, Commander-in-Chief of the Royal Cambodian Armed Forces, and Colonel Zhu Shuaifei, Deputy Military Attaché of the Chinese Embassy […]

Read More

Deep Repair on ‘Forever-Damaged’ Kampot-Veal Renh Road Still Awaiting Chinese Funds

The deep rehabilitation project on the so called ‘forever-damaged’ 20km section of NR 3 from Kampot to Veal Renh, is still waiting for the funds from China although the technical study has already been completed. In the meantime, the Ministry of Public Works and Transport has promised to make temporary repairs to facilitate travel, according […]

Read More

Construction of Kampot Tourism Port Set for Completion in June After Many Delays

The Kampot Tourism Port construction project was 93% complete by March, with the entire project expected to be completed in June 2022 after many delays. The progress of the construction was updated during a site inspection by HE Sun Chanthol, Minister of Public Works and Transport, on 29 March. With ground broken in 2018, the […]

Read More

Cambodia Mulls Adopting EU Construction Standards

The Ministry of Land Management, Urban Planning, and Construction (MLMUPC) is considering adopting Eurocodes into the Cambodian national building codes, to raise the construction sector to another standard level. 111 Cambodian experts from the government and the private sector recently attended a two-day workshop on construction standards from the European Union, known as Eurocodes, in […]

Read More

Construction of NR146B & NR148 Connecting Prey Nop to SHV Port 85% Complete

The project to upgrade NR146B (Samdech Sangkhareach Tep Vong Road) and NR148 are 85% complete as of 27 March 2022. The progress was unveiled during a site inspection by HE Sun Chanthol, Minister of Public Works and Transport, on Tuesday 28 March 2022. NR146B and NR148 have a total length of 43km, starting from the […]

Read More

MPWT to use modern radar & radioactive scanning machines to check road quality

The Ministry of Public Works and Transport (MPWT) will import more modern machinery to instantly check the quality of the road, instead of drilling and testing them in the lab. MPWT Minister HE Sun Chanthol said during the inspection of the construction site inspection of NR146B that Cambodia currently has two nuclear densitometry metre that […]

Read More

Battambang Airport to be Developed to 4C Capacity; Currently at Impact Resettlement Stage

Battambang Airport will be rehabilitated and developed into 4C capacity that can accommodate both domestic and international flights, while the feasibility study and impact resettlement works are still ongoing. The follow-up discussion on progress was held on 25 March between Secretary of State of the Secretariat of Civil Aviation HE Soy Sokhan and Battambang Governor […]

Read More