PM: No charge for electricity connection fee in Run Ta Ek & Peak Snaeng Development Zone

Prime Minister Samdech Hun Sen has ordered Electricité du Cambodge (EDC) to not charge the electricity initial connection fee to the people living in the Run Ta Ek and Peak Snaeng developments to help ease the expense of moving to a new place.

Speaking at the third meeting with local people on 21 October, PM Hun Sen said that EDC has already built the electricity infrastructure at a cost of US$6 million. However, the government will not charge that from the locals when requesting a new connection.

The free initial connection fee is regardless of the volume requested ranging from 5 amperes and 100 amperes.

However, PM Hun Sen clarified that the free part is only the initial connection fee, but the electricity fee is not free.

The EDC will have an office in this area to facilitate service for people.

- Video Advertisement -

Related Post

Southeast Asia’s Coastal Real Estate Development Faces Critical Balance with Mangrove Conservation

A groundbreaking study reveals that 85 percent of Southeast Asia’s mangrove forests, which comprise 32 percent of global mangrove coverage and sequester 15.9 million tonnes of carbon dioxide annually, face severe risks from real estate development, agricultural expansion, and climate change impacts, according to new research led by University of Queensland researcher Valerie Kwan, as […]

Korean Firm Donates 8,000 Electric Motorbikes to Cambodian Government to Combat Emissions

In a significant move to address climate change, South Korean company VeryWords has pledged to donate 8,000 electric motorbikes to Cambodian government officials. This initiative aims to reduce greenhouse gas emissions in Cambodia and promote the use of environmentally friendly transportation. The announcement was made during a Memorandum of Understanding (MoU) signing ceremony held on […]

Cambodia’s Electricity Capacity Set to Expand Significantly by 2024

By 2024, Cambodia is poised to enhance its electricity generation capacity to an impressive 5,044 megawatts, alongside a substantial extension of transmission lines to 3,890 kilometers. During the closing ceremony of the Electricity Authority’s conference on 3 February 2025, HE Keo Rattanak, Minister of Mines and Energy, confirmed that these targets had been met. The […]

GeoStudio, the Future of Limit Equilibrium Analysis

By Louis Henry Prates Integrated geotechnical workflow Seequent’s vision is to provide a suite of underground solutions that seamlessly integrate into every stage of infrastructure development. Starting with field data collection and management with OpenGround, moving on to subsurface characterization and geological modeling with LeapFrog Works, and culminating in advanced Geotechnical Analysis with PLAXIS and […]

Chinese Company Pledges to Complete Mondulkiri Wind Power Station by 2026

In a significant commitment to renewable energy in Cambodia, HK OASIS Power Energy Development Co., Ltd. has vowed to complete the construction of a 150-megawatt wind power station in Mondulkiri province by 2026. This pledge was made by Mr Wang Junwei, the company’s representative, during a meeting with HE Chea Vuthy, Secretary General of the […]

Cambodia and Germany Forge Alliance for Enhanced Waste Management

In a significant step towards improving urban aesthetics and environmental sustainability, Cambodia and Germany have joined forces to strengthen the nation’s waste management strategy. The Ministry of Environment and the German Agency for International Cooperation (GIZ) have embarked on a collaborative project titled “Green Initiative for Chakra Economy for Sustainable Waste and Solid Waste Management […]