Kratie & Stoeng Treng Welcome New Landfills Valued at Nearly US$10m

In a significant move to enhance hygiene and well-being, Kratie city in Kratie province and Stoeng Treng city in Stung Treng province have officially inaugurated two state-of-the-art landfills, collectively valued at nearly US$10 million.

The momentous occasion took place during the official opening ceremony presided over by HE Peng Po, Minister of Public Works and Transport, on 2 April 2024.

The landfill in Kratie city, a pivotal component of the Greater Mekong Subregion Corridor Development Project Phase 4, was constructed at a cost of US$4,943,948. Situated on 6 hectares of land in Phsar village, Dar commune, Chit Borey district, Kratie province, this landfill spans an area of 26.88 hectares. Designed to accommodate approximately 196,220 cubic metres of waste, the landfill measures 135.75 metres x 122.50 metres and is 2 metres deep. It serves the residents of Kratie’s four districts, namely Sangkat Kratie, Krakor, Orussey, and Roka Kandal.

Similarly, the landfill in Stoeng Treng city, also a part of the Greater Mekong Subregion Corridor Phase 4 development project, was constructed by MTA Construction Co., Ltd., at a cost of US$4,838,207. Positioned on 7.26 hectares of a total area of 20.78 hectares in O’Treal village, Thala Parivat commune, Thala Parivat district, Stung Treng province, this landfill is designed to hold approximately 176,438 cubic metres of waste. Measuring 146.06 metres x 109.52 metres, with a depth of 1.45 metres, it caters to the residents of Stoeng Treng’s five Sangkats: Sangkat Stoeng Treng, Srah Russey, Preah Bat Samaki, and Thala Parivat. (Read more)

These modern landfills are equipped to operate for up to 20 years, adhering to stringent technical standards to ensure sustainable waste management practices in the respective provinces.

- Video Advertisement -

Related Post

Techo International Airport Nears Completion: A New Gateway to Cambodia

In an exciting development for Cambodia’s aviation sector, the Techo International Airport construction project is now over 94% complete, with the total investment reaching nearly USD 1.4 billion. This ambitious project promises to transform the country’s skyways and enhance domestic and international travel connectivity. As of late December 2024, critical infrastructure components, including the Passenger […]

Chinese Company Pledges to Complete Mondulkiri Wind Power Station by 2026

In a significant commitment to renewable energy in Cambodia, HK OASIS Power Energy Development Co., Ltd. has vowed to complete the construction of a 150-megawatt wind power station in Mondulkiri province by 2026. This pledge was made by Mr. Wang Junwei, the company’s representative, during a meeting with HE Chea Vuthy, Secretary General of the […]

Serei Sophorn Welcomes the New 11 hectares of Landfill

In a significant development to enhance urban environmental management around the Tonle Sap Lake, the government officially inaugurated over 11 hectares of landfill on January 17, 2025. This project, part of the Phase 2 initiative, received support through a concessional loan from the Asian Development Bank (ADB). The landfill in Kangvea village of Sangkat Kampong […]

China Approves Highest & Largest Hydropower Dam in Tibet Worth USD 127 Billion Amid Global Concerns

China has approved the construction of the world’s largest hydropower dam on the lower Yarlung Tsangpo River in Tibet, with an estimated cost of USD 127 billion. The project, poised to generate three times more energy than the Three Gorges Dam, is expected to redefine renewable energy development globally but has raised significant concerns about […]

Cambodia Welcomes 17 New Investment Projects Worth USD 150 Million in January 2025

In an exciting start to the year, Cambodia’s investment landscape is poised for growth as the country received a notable infusion of capital with 17 new investment projects. These initiatives, collectively valued at approximately USD 150 million, were registered during the inaugural “One Window Service Office” (OWSO) meeting for 2025, held on 15 January, chaired […]

Progress Update on Kampong Thom Dam Project: 25% Completion Mark Achieved

Construction on the Kampong Kor Dam is progressing steadily, with 25% of the project now completed. HE Chan Sinath, Secretary of State, provided this update during an inspection of the project on 12 January 2025. During the inspection, HE Chan Sinath outlined the project’s current status, specifying that the dam’s construction has reached 10%, while […]