Bentley’s PLAXIS Ends the Guesswork Beneath Megaprojects

From earthquake-stricken factories in Japan to tight-squeeze tunnels under Madrid, the risks inherent in massive construction projects have traditionally been a game of costly conjecture. However, Bentley Systems’ PLAXIS is changing all that, allowing geotechnical engineers to peer beneath the earth and predict ground behavior with unprecedented accuracy.

Bentley Systems’ advanced finite element analysis software, PLAXIS 3D, is enabling engineers to conduct sophisticated three-dimensional simulations for projects spanning civil infrastructure, mining, energy, and environmental sectors. It takes the guesswork out of what lies beneath our feet, allowing teams to build smarter, faster, and safer.

Here are some real-world examples of PLAXIS applications.

Triple Earthquake Simulation, Fukushima, Japan

After the 2011 Great East Japan Earthquake and tsunami in Fukushima, one of the region’s rebuilding efforts involved a one-story factory constructed on silty ground. Engineers typically had difficulty simulating the behavior of silty ground, but using a PLAXIS 3D soil model and seismic records from nearby sensors, engineers simulated the TNF’s performance across all three earthquakes. The model not only matched the observed post-quake settlements, but it also confirmed something crucial: liquefaction had occurred in the silty ground, challenging long-held assumptions that there was a low risk of this happening.

Madrid Metro Line 5, Spain

The most formidable challenge is an underground crossing that threads a new tunnel between the existing Metro Line 8 tunnel and the M-11 motorway’s embankment. Clearance is just 3 meters at its tightest point, posing a risk to the stability of existing infrastructure.

However, PLAXIS 3D helps develop a sophisticated soil-structure interaction model. This complex simulation encompasses over 400 construction phases and all structures within the critical crossing zone. The model demonstrated that the tunnel could be safely built by excavating the tunnel face in shorter segments (1.25 meters) to minimize ground movement and protect nearby infrastructure.

Engineers used Plaxis 3D for the ground modeling and structural planning for Madrid’s Metro Line 5 project.

Hong Kong’s Deepest Subsea Connection

Costing US$2.33 billion, the Tuen Mun-Chek Lap Kok Link Tunnel, Southern Landfall, is a strategic 5-kilometer, dual two-lane subsea tunnel in Hong Kong. It’s designed to be the city’s deepest and longest. Golder Associates faced complex geotechnical conditions, including alluvium, marine deposits, thick sand fill, and high water pressure.

Golder Associates employed Bentley’s geotechnical applications, including PLAXIS 3D, to optimize the tunnels. This helps reduce the number of required barrettes by 52, while shortening 46 others by an average of 2.8 meters. These efficiencies saved US$16 million, cut construction time by two months, and reduced carbon dioxide emissions by an estimated 1,500 tons.

Entrance to the Tuen Mun-Chek Lap Kok Tunnel. Image credit: Wikimedia Commons

Marina Bay Sands, Singapore

Singapore’s iconic Marina Bay Sands development required one of the country’s largest and deepest urban excavations – a sprawling basement up to 18 meters deep in soft marine clay. A particularly sensitive area was the Benjamin Sheares Bridge, Singapore’s longest bridge, whose foundations lay close to the edge of the development. The excavation posed a serious risk of ground movement, with the potential to overstress the bridge’s existing connections.

Marina Bay Sands in Singapore.

Arup engineers used PLAXIS 2D to assess and manage this risk, simulating the soil-structure interaction between the excavation support system and the surrounding ground, with a focus on the bridge abutments. The analysis revealed that lateral ground movement from the deep excavation would indeed exceed safe limits for the bridge’s fixed structural connections.

Instead of attempting to eliminate all movement, an impractical and costly task, the team modified the bridge itself, replacing three fixed connections with adjustable pins so that the deck could sufficiently articulate to tolerate the predicted ground movement.

These examples underscore a profound shift in engineering. By replacing assumptions with simulation, PLAXIS not only validates designs—it actively optimizes them, unlocks enormous savings, and ensures the stability of our most ambitious global infrastructure.

- Video Advertisement -

Related Post

Bentley Systems Wins Gold Stevie Award for AI Breakthrough in Engineering

Bentley Systems has won the Gold Stevie Award for Technology Breakthrough of the Year in the Construction and Civil Engineering Technology category at the 2026 Stevie Awards for Technology Excellence. The award recognizes Bentley’s Model Context Protocol (MCP) servers for STAAD. Pro and MicroStation, which bring agentic artificial intelligence into established infrastructure engineering workflows. Bentley’s […]

Freeland Municipal Authority Uses Digital Twins to Reduce Water Loss

Freeland Municipal Authority (FMA) in Pennsylvania is using a digital twin to improve leak detection, reduce nonrevenue water, and strengthen the long-term resilience of its water system. Serving about 3,900 people, FMA had struggled to identify leaks and track water losses efficiently. The utility often relied on outside companies for leak detection, making the process […]

India Builds Mega Luxury Resort Faster with Digital Engineering

AVS ENGINEERS and ISID STRUCTURES have completed the structural design of the Fairmont Palace Udaipur luxury resort in Rajasthan, India, four months ahead of schedule using Bentley’s STAAD.Pro, RAM Structural System, and RAM Elements. Completed in July 2025, the 500,000-square-foot resort combines modern luxury with traditional Rajasthani architecture. Its steep hillside location and complex features, […]

China Uses Digital Twin  to Build First Large-scale Power Station in Karst Geology

Shanghai Investigation, Design & Research Institute Co., Ltd. (SIDRI) has used Bentley’s digital engineering and digital twin technologies to overcome complex geological challenges at the Caiziba Pumped-Storage Power Station in Fengjie County, Chongqing, China. The project is the first large-scale pumped-storage power station built in an area with complex karst geology, where caves, fissures, underground […]

Viscan Transforms B29 Highway Project With Digital Twin Technology

Viscan GmbH has transformed its reality capture workflow for the B29 highway expansion in Baden-Württemberg, turning an initially unreliable digital process into a high-performance digital twin system for one of Germany’s first fully digital construction sites. The B29 project includes nine new structures, bridges, and retaining walls. Viscan’s role was to provide construction teams and […]

AI Could Predict Infrastructure Failures Weeks in Advance

AI-powered analytics are helping infrastructure engineers move from reacting to failures toward predicting problems before they become emergencies, according to Vahid Abdollahi, an Applied AI Scientist at Bentley Systems. Traditional monitoring often alerts operators only after a measurement crosses a fixed threshold. AI, however, can analyze data from multiple sensors to identify unusual patterns and […]