ADB Provides US$12 Million Loan to Construct Drainage & Waste Management System in Kampong Thom

The Asian Development Bank (ADB) has provided a US$12 million loan to build a wastewater treatment plant, sewage system, landfill, and other related infrastructure in Stung Sen city in Kampong Thom province.

According to a meeting between relevant officials on Wednesday 7 July, the project includes the construction of a wastewater treatment plant with the capacity to filter up to 2,500 cubic metres of wastewater per day, a 39.2km sewage pipe and a 17.1km drainage network, as well as a landfill with the storage capacity of 48,000 cubic metres.

The Ministry of Public Works and Transport has already signed a construction contract with China First Metallurgical Group Ltd. Meanwhile, the construction will take three years to complete, from July 2020 to July 2023.

During the meeting, Kampong Thom Governor HE Sok Lu has also ordered relevant authorities to begin inspecting the sites and taking action on illegal land encroachment in that area before the actual construction begins.

The governor also urged the company to focus and accelerate the construction drainage system to help prevent flooding during the rainy season.

- Video Advertisement -

Related Post

A New Frontier for Conservation: US$520K Canal Project to Shield Techo Sen Russey Trep National Park

In a significant conservation effort, the Royal Academy of Cambodia unveiled plans on 5 May 2024 for the construction of a 52-kilometre-long canal to safeguard the expansive Techo Sen Russey Trep National Park. Spanning 6 meters in width and 2.5 meters in depth, this ambitious US$520,000 project aims to encircle and protect over 10,000 hectares […]

49km of Kratie Province Roads Revitalization Hits Midway Mark: A 53% Completion in Infrastructure Enhancement

As of 8 May 2024, the Kratie Provincial Administration has reported a significant milestone in the enhancement of its transportation infrastructure, with the rehabilitation project of two main provincial roads reaching approximately 53% completion. Spanning nearly 49 km, Provincial Road No. 377 and Road 377A are undergoing extensive improvements to bolster the quality and maintenance […]

Revitalizing Kampot: AZ Group to Invest Up to US$10M in International Tourist Port

AZ Builder, a subsidiary of the prominent Cambodian AZ GROUP, is set to invest between US$ 5 million and US$ 10 million in the rehabilitation of the Kampot International Tourist Port, a project that has faced delays since its inception in 2022. This strategic investment aims to rejuvenate the port, enhancing its accessibility for ships […]

Kratie’s Mekong River Bridges Approach Halfway Mark in $111 Million Project

The ambitious project to construct bridges across the Mekong River in Kratie province, valued at US$111 million,  has surged ahead, with completion surpassing 49% as of early May 2024 while the road connection component stands at an impressive 36.24%. This milestone was confirmed by the Ministry of Public Works and Transport’s official Facebook page on […]

Phnom Penh Drainage and Diversion Project Reaches 60% Completion

The project aimed at draining water and diverting flows from Phnom Penh to rehabilitate 10 canals spanning 260 kilometers has achieved a significant milestone, reaching 60% completion. This update comes directly from the Ministry of Water Resources and Meteorology on May 4, 2024, marking substantial progress in addressing flooding issues in the nearby provinces. During […]

Deputy PM Assures No Adverse Impact on Vietnam as Cambodia Forecasts Canal Project to Save Nearly US$600 Million

The volume of water diverted by the Funan Techo canal relative to the overall flow of the Mekong River is negligible, ensuring no adverse effects on Cambodia’s environment and neighboring regions, including Vietnam. This affirmation comes from HE Sun Chanthol, Deputy Prime Minister and Deputy PM and First President of the Council for the Development […]