Siem Reap Provincial Authority Announce Immediate Demolition of Buildings Along Eight Roads to Prepare for New Road Construction

The Siem Reap Provincial Authority has ordered all owners to immediately demolish any buildings along eight roads in Siem Reap City within 15 days from the date of this announcement, and will soon start construction projects on these roads, according to an announcement dated on 23 June 2022.

All business buildings, houses, constructions, and other properties that are affected and, on the land, along the eight roads must be demolished by the determination, which is measured and marked by the decision of the Administrative Commission during Systematic Land Registration (LMAP).

The authority will construct these eight roads using government funding including:

  1. The road behind Pur Langkar Pagoda (In front of Hang Trop Hotel) to Boengdonpa Concrete Road 670, which is 670 metres × 6 metres with a 1-metre diameter drain in a 670-metre-long road.
  2. Slaughter Road (Sangkat Chreav) from the ring road to Khnar Chas Road, which is 2330 metres × 7 metres with 6 drains crossing the road 12 metres​ apart.
  3. Ice Factory Road (Sangkat Chreav) from the ring road to the East direction, which is 860 metres × 7 metres with 0.8-metre diameter drains along the 1720-metre-long road.
  4. Phum Kuk Krasang Road (Sangkat Svay Dankum) from Provincial Road 267 (gate of Sun Boutique to the road to Stueng America), which is 800 metres × 7 metres with drains on both sides of road with a diameter of 0.8 metres and a length of 500 metres.
  5. National Road 6 (Chao Sang Hok) to the South, which is 170 metres × 6 metres with 0.8-metre diameter drains.
  6. National Road 6 (Total Phsar Leu) to Ta Uch Road, which is 360 metres × 7 metres with 0.8-metre diameter drains in the centre of the road.
  7. Road near Mondial Restaurant to the North, which is 720 metres × 6 metres and 0.8 metres in diameter of the drain with 720 metres long in the centre of the road.
  8. North Road of Wat Brasat Tramneak with 0.8-metre diameter drains.

After the expiration of 15 days, the Siem Reap Provincial Authority will demolish any buildings according to the legal procedures in force and will not be responsible for any damage or loss of properties in case all construction owners do not comply with this announcement.

- Video Advertisement -

Related Post

Cambodia’s Land Ministry Expands Legal Framework with Over 230 Regulatory Instruments to Upgrade Construction and Urban Standards

Ministry enacts 65 legal codes and advances 165 draft regulations to ensure safety, structural quality, and sustainable urban development across the Kingdom Phnom Penh: Establishing a comprehensive legal framework and clear technical guidelines remains a foundational priority for the Royal Government of Cambodia in regulating urban development and building practices. In early September, the Ministry […]

Ministry of Public Works and Transport Partners with EU4PFM Project to Establish Standard Operating Procedures for Public Investment Management

Permanent Secretary of State H.E. Koy Sodany convenes key consultative meeting to strengthen transparency, accountability, and fiscal discipline across national infrastructure projects Phnom Penh: Strengthening public financial management and optimizing capital allocation remain cornerstone objectives for Cambodia’s sustainable socio-economic growth. On the morning of Thursday, August 27, 2026, H.E. Koy Sodany, Permanent Secretary of State […]

Cambodia Accelerates Legal Reforms Through National Workshop on Regulatory Impact Assessment and Good Practice Regulation

Permanent Deputy Prime Minister Vongsey Vissoth leads multi-agency session with British experts to refine regulatory drafting and enhance economic competitiveness Phnom Penh: Modernizing Cambodia’s legal ecosystem and improving the efficiency of regulatory frameworks achieved a key institutional benchmark aimed at strengthening public administration and fostering a predictable business environment. On August 25, 2026, the Office […]

Authority to Launch Sewerage Service Fee Collection After Policy Review and Approval

In an important move to streamline the collection of sewerage service fees, the Council of Ministers convened a closed meeting on December 26, 2025, to discuss a draft sub-decree outlining the procedures for this process. Chaired by HE Liv Sovanna, Vice President and Chairman of the 4th Working Group of the Council of Lawmakers, and […]

National Council for Building Technical Regulations Takes Significant Steps Towards Enhanced Standards in Cambodia

HE Say Samal leads the meeting to approve the draft technical regulations to ensure safety and sustainability in the construction sector The National Council for Building Technical Regulations convened a significant meeting under the auspices of the Ministry of Land Management, Urban Planning, and Construction, according to the meeting held on 18 December 2025. This […]

The Gov’t Announces New Public Bus Lines to Techo International Airport to Ease Traffic Congestion

In an effort to alleviate traffic congestion and improve travel convenience, the Phnom Penh City Bus Autonomous Administration (CBA) has announced plans to launch two new public bus lines to Techo International Airport starting September 9, 2025. This initiative aims to provide residents and visitors with an efficient transportation option to one of Southeast Asia’s […]