Uncategorized
Deep Repair on ‘Forever-Damaged’ Kampot-Veal Renh Road Still Awaiting Chinese Funds
The deep rehabilitation project on the so called ‘forever-damaged’ 20km section of NR 3 from Kampot to Veal Renh, is still waiting for the funds from China although the technical study has already been completed. In the meantime, the Ministry of Public Works and Transport has promised to make temporary repairs to facilitate travel, according to Minister of Public Works and Transport Minister HE...
Read MoreConstruction of Kampot Tourism Port Set for Completion in June After Many Delays
The Kampot Tourism Port construction project was 93% complete by March, with the entire project expected to be completed in June 2022 after many delays. The progress of the construction was updated during a site inspection by HE Sun Chanthol, Minister of Public Works and Transport, on 29 March. With ground broken in 2018, the construction of this project has been delayed many times, from the...
Read MoreCambodia Mulls Adopting EU Construction Standards
The Ministry of Land Management, Urban Planning, and Construction (MLMUPC) is considering adopting Eurocodes into the Cambodian national building codes, to raise the construction sector to another standard level. 111 Cambodian experts from the government and the private sector recently attended a two-day workshop on construction standards from the European Union, known as Eurocodes, in late Mar...
Read MoreConstruction of NR146B & NR148 Connecting Prey Nop to SHV Port 85% Complete
The project to upgrade NR146B (Samdech Sangkhareach Tep Vong Road) and NR148 are 85% complete as of 27 March 2022. The progress was unveiled during a site inspection by HE Sun Chanthol, Minister of Public Works and Transport, on Tuesday 28 March 2022. NR146B and NR148 have a total length of 43km, starting from the intersection of NR4 at Km178 + 165 in Veal Renh commune, Prey Nob district, to...
Read MoreMPWT to use modern radar & radioactive scanning machines to check road quality
The Ministry of Public Works and Transport (MPWT) will import more modern machinery to instantly check the quality of the road, instead of drilling and testing them in the lab. MPWT Minister HE Sun Chanthol said during the inspection of the construction site inspection of NR146B that Cambodia currently has two nuclear densitometry metre that were were imported from the United States, while more...
Read MoreBattambang Airport to be Developed to 4C Capacity; Currently at Impact Resettlement Stage
Battambang Airport will be rehabilitated and developed into 4C capacity that can accommodate both domestic and international flights, while the feasibility study and impact resettlement works are still ongoing. The follow-up discussion on progress was held on 25 March between Secretary of State of the Secretariat of Civil Aviation HE Soy Sokhan and Battambang Governor HE Sok Loo. Battambang ...
Read MoreJapanese-Standard Clean Water Supply System in Pursat Officially Operational
A Japanese-standard water supply system in Reang Khvav community of Phnom Oral Wildlife Sanctuary in Pursat Province has been officially inaugurated. The inauguration ceremony was held on 25 March 2022, presided over by Pursat Provincial Governor HE Cheav Tay and Secretary of the Embassy of Japan in Cambodia Kuribayashi Takanori. Built under a Japanese grant aid of over US$100,000, the netwo...
Read MoreMPWT Launches Cambodia’s First Public EV Charging Station
The first public electric vehicle (EV) charging station located within the Ministry of Public Works and Transport (MPWT) complex, was officially put into use on 26 March 2022, with at least 10 others to follow by the end of this year. The launch event was presided over by MPWT Minister HE Sun Chanthol along with other stakeholders including UNDP, the Federation of Automobile Associations in Cam...
Read MoreUS$8 million Ang Duong Hospital ENT Treatment Centre Officially Inaugurated
The new Ear, Nose, Throat (ENT) treatment centre at the Ang Duong Hospital, which was funded and built by South Korea, was officially inaugurated on 28 March 2022, bringing Cambodia’s specialised medical services of ear, nose, and throat to another level. The inauguration ceremony of the building was presided over by Samdech Techo Hun Sen, Prime Minister of Cambodia and HE Park Heung-kyeong, Am...
Read MoreRMA Launches New Tractor & Heavy Equipment Sales Branch in Kampong Thom
Advertorial RMA Cambodia has inaugurated a new sales branch in Steung Sen district of Kampong Thom province to expand the market and improve the quality of service to customers. Held on 26 March 2022, the launching event was attended by RMA Cambodia executives, Kampong Thom government officials, and other guests. The opening of the new sales branch in Steung Sen district is to bring servi...
Read More