2nd Phase of Camko City to Begin

Located on public space between the Canadia Bank Tower (OCIC Tower) and the Vattanac Capital Tower ,which has been used for years for parking for Canadia Bank Tower’s staff, tenants and guests, the two-storey underground parking lot will be built over 2,898 square meters; 78m wide, 69m long and 6.6m high. The plan is for the lot to accommodate 257 cars, said Samreth Mardi, the OCIC architect who has developed the master plan.

“The traffic congestion and growing number of vehicles from the staff and people working in Canadia Tower has forced us to build this kind of underground parking space to reduce the congestion,” he said.

This new parking lot will link to the current parking under Canadia Bank Tower via an underground tunnel. Once it is complete, motorbikes and cars owned by staff and tenants working at the bank and visitors will be able to park there.

While OCIC has estimated the construction cost at about US$4 million, the company will build it by itself. After it has excavated the surface soil and built the parking space, it will cover it with publicly accessible landscaping on the surface. The banyan tree which was planted by late King Norodom Sihanouk 40 years ago will not be affected. “We won’t remove or replant the banyan tree; we will just build the parking around it by preserving the surrounding soil to ensure the tree can survive well.”

No shopping stands will be permitted there, Mardi said, noting that the plan had been proposed to City Hall in 2011.

While construction is expected to kick off late this year, City Hall has already approved the first phase of the master plan with some remaining issues to deal with regarding drainage systems and telecommunication cables under and nearby the project site.

“Now City Hall has advised us to coordinate with the Ministry of Public Works and Transport regarding the drainage system and other related matters,” he said. “I believe the master plan can be finally approved in the next two months because we have dealt with many of those matters already.”

Because the project is being built on public land, OCIC is not sure whether they will rent the land and pay the rental fee to City Hall or make it as a private parking business by sharing the profits with City Hall instead, Mardi said, pointing out that the firm has submitted many options to the Municipality to consider.

If the land will be rented from the Municipality, OCIC will allow only vehicles of the staff, tenants and guests of Canadia Bank Tower to park there and a vehicle parking quota will be applied to the tower’s tenants. However, if it comes under a profit-sharing approach with City Hall, the parking space will be open to all vehicles on a 24-hour basis and parking fees will be applied.

According to Mardi, the Vattanac Capital Tower will also have their own underground parking space to be built over 5,000 square meters under the adjoining two public garden blocs. But Vattanac’s three-storey underground parking plan will be connected to the Vattanac Tower building. No similar underground parking space has yet been granted to the 20-storey Exchange Square, formally known as Landmark being developed by HongKong Land.

“The two projects won’t connect with each other because they will be built to a separate height and level that can’t be linked together,” he said.

While vehicle imports are rising gradually, City Hall spokesman Long Dimanche said recently that with over 400,000 cars and over 1 million motorbikes commuting in the capital there will be more problems in the future for the city’s available parking spaces.

- Video Advertisement -

Related Post

Cambodia Nears Completion of Land Registration, Targeting 2028 Finish

Cambodia is making significant strides in its land registration initiative, with over 7.7 million land parcels successfully registered nationwide. Only about 1.5 million parcels remain, and the Ministry of Land Management, Urban Planning and Construction anticipates their registration will be completed in the near future. Government Spokesperson H.E. Pen Bona announced these updates during a […]

Four Companies Submit Proposals to Redevelop Block A in Cambodia

The Ministry of Mines and Energy has announced that nine companies have shown interest in redeveloping Block A, with four of them officially submitting proposals for oil exploration. The other five companies have yet to file formal development applications. According to a report released after the recent annual conference, the four companies that have submitted […]

Cambodia Inaugurates New National Assembly Administration Building with Vietnamese Support

Cambodia has officially inaugurated a state-of-the-art National Assembly administration building, thanks to a generous aid package of $25 million from Vietnam. The inauguration ceremony took place on November 21, 2024, with prominent figures in attendance, including Samdech Khuon Sodary, President of the National Assembly, and His Excellency Tran Thanh Man, President of the National Assembly […]

Brunei’s Khazanah Nasional Targets Multi-Sector Infrastructure Investment in Cambodia

Khazanah Nasional Berhad, a leading investment firm from Brunei Darussalam, has announced plans to explore infrastructure investment opportunities in Cambodia, focusing on health, water resources, transport infrastructure (including railways and airports), and banking. This initiative was discussed during a meeting between PM Hun Manet and Khazanah’s CEO, Mr. Dato Khairul Hamed, on 19 November 2024. […]

Chinese Firm Proposes Oxygen Supply Systems and Nursing Homes in Cambodia

Henan Taiyi Medical Technology Co., Ltd., a prominent Chinese medical equipment manufacturer, has unveiled plans to collaborate with Cambodia’s Ministry of Health to install oxygen supply systems in public hospitals and establish nursing homes nationwide. The proposal, aimed at strengthening the country’s healthcare infrastructure, was discussed during a meeting on 18 November 2024 between His […]

Japan Invests Over USD40 Million in Cambodia, Enhancing Economic Partnerships in 2024

Japan has invested over USD40 million in Cambodia during the first ten months of 2024, reaffirming its position as the seventh-largest investor in the country. This development was highlighted in a report by the Council for the Development of Cambodia, released on 19 November 2024. To further strengthen bilateral economic ties, the Cambodian Duke Association […]