ADF Helps Cambodia Develop a Long-Term Energy Trajectory-Modelling Tool

Agence Française de Développement (AFD) has provided €300,000 to help Cambodia develop a long-term energy trajectory-modelling tool, according to a press release early this month.

The fund is provided through a program entitled “Energy Sector Modelling Tool for the Ministry of Economy and Finance of the Royal Government of Cambodia”, with the aim to support long-term low carbon development plans until 2050.

The project was launched in January 2021 and will be carried out by IED Group and Artelys, with support from IDDRI’s Deep Decarbonisation Pathways Initiative acting as a scientific advisor.

The program will consist of three major tasks including:

1) Develop a robust, user-friendly, energy sector modelling tool, capable of aggregating existing data inputs and studies to model energy supply and demand dynamics across all major energy types.

2) Design and model four long term energy transition scenarios to 2050: Current Policies, Least Cost Development, Sustainable Development and Balanced

3) Accompany stakeholders in mobilising the modelling tool and scenario analysis in decision-making and policy dialogue processes through technical training and capacity building, as well as through consultative working group meetings and the development of policy memos

With this program, AFD expects that Cambodia will develop a better, more sustainable and, more importantly, low-carbon energy plan.

- Video Advertisement -

Related Post

A $117 Million Economic Lifeline: Prime Minister Hun Manet Inaugurates Newly Expanded National Road 7

The newly upgraded 4-lane highway connecting Skun and Kampong Cham town is projected to deliver a 15.27% economic return, slashing travel times and boosting agricultural trade… In a major boost to Cambodia’s internal logistics network, a vital 45.489-kilometer section of National Road 7 connecting the Skun roundabout to the Kizuna Bridge roundabout in Kampong Cham […]

Maritime Geopolitical Rivalry Intensifies as Vietnam Accelerates $4 Billion Deep Sea Port Project in the Far South

The massive infrastructure development on Hon Khoai Island serves as both an economic gateway for the Mekong Delta and a strategic maritime shield amid shifting regional dynamics Ho Chi Minh City: The geopolitical and trade landscape of Southeast Asia is entering a highly competitive phase as nations across the region race to build strategic advantages. […]

Field Assessments Underway for Kandal Province New Strategic Bridge

A joint delegation evaluates four potential sites for the Koh Khsach Tonlea crossing to enhance rural connectivity and market access In a significant step forward for Cambodia’s infrastructure development, a multi-institutional technical team has launched a comprehensive field survey to determine the optimal location for the upcoming Koh Khsach Tonlea Bridge project in Kandal Province. […]

Cambodia Completes Major Expansion of National Road 7 Connecting Skun and Kampong Cham

The $117 million infrastructure upgrade backed by China is set for an official inauguration by Prime Minister Hun Manet in July… The extensive upgrade of National Road 7, stretching over 45 kilometers to connect the hub of Skun with Kampong Cham town, has officially reached 100% completion. To mark this infrastructural milestone, a formal handover […]

Cambodia to Upgrade National Road 4 Section in Chbar Mon to Drive Regional Economic Growth

The Kampong Speu Provincial Administration recently announced a comprehensive infrastructure initiative aimed at upgrading the aesthetics and functionality of a key section of National Road 4 within Chbar Mon City. The project is strategically designed to transform the province into a vital economic and commercial center for the region. This development plan was detailed in […]

Bassac Riverbank Stabilization Project in Kandal Reaches 60% Completion

The ongoing infrastructure initiative to reinforce the Bassac riverbank in Sampov Poun City, Kandal Province, has achieved a significant milestone, with construction teams completing approximately 60% of the designated works. Local authorities and engineering crews remain heavily committed to accelerating the remaining phases to ensure the project concludes entirely on schedule. During a recent field […]