Doun Tri Dam Construction 97% Complete

 

The construction of the Doun Tri Dam in Battambang province is now 97% complete, with final completion expected by October 2025. This significant infrastructure project, located in Rukkakiri district, is being financed through concessional loans from the Republic of Korea.

During a project progress review led by HE Tho Jetha, Minister of Water Resources and Meteorology, it was confirmed that the dam’s development is on track. “The Doun Tri Dam will play a critical role in enhancing irrigation, providing clean water, and mitigating flood risks in the region,” the minister stated.

Key components of the Doun Tri Dam project include:

  1. A main dam stretching 654 metres.
  2. A spillway measuring 414 metres.
  3. A 462-metre-long horseshoe-shaped water diversion tunnel.
  4. A multi-level water management structure featuring five gates and a 55-metre bridge,
  5. A paved access road extending 17.3 kilometres,
  6. Eight water release structures and three temporary bridges.

The entire construction process began in June 2018 and is expected to span 90 months. Advanced construction techniques, including tunnelling and rock excavation, have been employed to ensure the dam’s structural integrity and longevity.

Once completed, the Doun Tri Dam will boast a water storage capacity of approximately 163.1 million cubic metres. This capacity is anticipated to irrigate around 33,000 hectares of agricultural land during the rainy season and an additional 4,500 hectares in the dry season. The project promises to significantly improve the livelihoods of residents in 11 communes across Maung Russey and Rukkha Kiri districts, as well as in Bakan district of Pursat province.

In addition to agricultural benefits, the dam is designed to provide clean drinking water to local communities and reduce the risk of flooding in downstream areas, representing a vital advancement in infrastructure for the region.

- Video Advertisement -

Related Post

MPWT and AIIB Review Feasibility Study for National Road 8 Upgrade Connecting Prek Tamak to Ponhea Kraek

High-level technical session examines environmental-social assessments and financial modeling to accelerate a critical transit corridor across eastern Cambodia Phnom Penh: Upgrading Cambodia’s strategic transport corridors gained momentum as government officials and international financial partners reviewed preliminary engineering and environmental evaluations for a vital regional thoroughfare on National Route 8. According to the meeting session on […]

Prime Minister Inaugurates 98-Kilometer Road Network Worth Nearly $44 Million in Northeastern Cambodia

Modernizing National Road 73 alongside Provincial Roads 377 and 377A, the $43.95 million project enhances climate resilience, boosts agro-logistics, and strengthens trade routes across Kratie and Tboung Khmum. In a major boost to northeastern Cambodia’s transport networks, Prime Minister Samdech Thipadei Hun Manet officially inaugurated three upgraded national and provincial road sections in Kratie and […]

Cambodia Advances Strategic Infrastructure Plan with Upgraded National Road 1 and New Mekong River Bridge

Discussions on JICA’s draft final report highlight a 53-kilometer road widening project and an Extradosed Bridge connecting Phnom Penh to Areyksat along the Southern Economic Corridor As Southeast Asian nations continuously upgrade their transport networks to drive economic integration and regional competitiveness, Cambodia is taking significant strides to modernize its core transit corridors. On Wednesday, […]

National Road 7 Expansion Project Nears Completion as Vital Economic Link Reaches 90% Finish

Accelerated construction on the Skun to Kampong Cham corridor aims for early delivery to boost regional trade and transport efficiency The expansion and upgrade of National Road 7, a critical infrastructure project connecting the Skun area to Kampong Cham city, has reached nearly 90% completion as of March 2026. This significant milestone was highlighted by […]

Cambodia Road Network Expands to Over 20,000 Kilometers in 2025

Strategic infrastructure development adds 426 kilometers to the national network to boost logistics and economic growth The total length of developed roads in Cambodia reached 20,733.91 kilometers by the end of 2025, marking a notable increase of approximately 426.32 kilometers compared to the previous year. This data was highlighted in the 2025 Annual Progress Report […]

Cambodia and Laos to Fast-Track Cross-Border Connectivity with New Ratanakiri-Attapeu Road Link

Joint inspection team to finalize construction zones this February to unlock new trade and economic opportunities Cambodia and Laos have reached a pivotal agreement to conduct a joint technical inspection aimed at defining the specific zones for a new road project connecting Ratanakiri province in Cambodia to Attapeu province in Laos. This initiative is a […]