Thailand-China High-Speed Railway Hits Fast Track: Phase 1 Operational by 2027

The dream of a high-speed rail connection between Thailand and China is rapidly becoming a reality. The State Railway of Thailand has unveiled ambitious plans to have the first phase of the Thailand-China high-speed rail line, spanning from Bangkok to Nakhon Rachasima, operational by the year 2027. This monumental project, which will encompass a 253-kilometer stretch, is already 24% complete and carries an estimated cost of $5.1 billion.

Upon completion, this groundbreaking railway will traverse a remarkable 608 kilometers, linking Bangkok in the southwest to Nong Khai on the northeastern border of Laos. Beyond Nong Khai, the vision extends to a further 355 kilometers, venturing into Vientiane, where it will seamlessly connect with the Laos-China line leading to Kunming.

The final phase, stretching from Nong Khai to Vientiane, comes with a price tag of $8.5 billion but remains in the preliminary planning stages. This colossal undertaking is set to transform regional connectivity and boost economic prospects for all nations involved.

The Thai-China high-speed railway is a testament to international collaboration, being constructed by the China Railway Construction Corp. It will feature Chinese rolling stock, incorporating CRRC’s Fuxing Hao CR300 high-speed trains, capable of achieving remarkable speeds of up to 250 kilometers per hour.

This ambitious project promises to redefine travel and trade, fostering deeper economic and cultural ties between Thailand, Laos, and China.

- Video Advertisement -

Related Post

National Road 7 Expansion Project Progress Report: 56% Complete

The expansion and upgrade of National Road 7, stretching from Skun Roundabout to Kizuna Bridge, has reached an impressive 56% completion, as announced by His Excellency Un Chanda, Governor of the Kampong Cham Provincial Government, during a recent Provincial Council meeting. The Governor provided a comprehensive overview of the project’s progress, highlighting notable advancements in […]

Twin Flyovers Near Completion at Phnom Penh-Kandal Border

  The construction of the Samdech Thipadei Hun Manet flyover, connecting Phnom Penh and Kandal province, has reached an impressive milestone with 85% of the project completed. The latest update comes as the twin flyovers advance toward the final stages of construction. A significant ceremony marking the connection of the bridge body was held on […]

Major Infrastructure Project Nears Completion in Siem Reap

A significant infrastructure development is underway in Siem Reap province, with a 15-kilometer road connecting National Road 6 to the Kampong Phluok tourist area now approximately 70% complete, according to an announcement from the Siem Reap administration. This vital roadway, which measures 8 meters in width, is part of a project initiated by Prime Minister […]

Japan’s JBIC Eyes Partnership for Major Infrastructure Development in Cambodia

The Japan Bank for International Cooperation (JBIC) has showcased a strong interest in collaborating on significant infrastructure projects in Cambodia. This development was announced following a meeting between Prime Minister Hun Manet and JBIC President and CEO Maeda Tadashi on May 28, 2025. During their discussions, President Maeda emphasized JBIC’s commitment to fostering partnerships with […]

The Government Announces New Opening Date for Techo International Airport

In a significant new update for travelers and the aviation industry, the State Secretariat of Civil Aviation has announced a revised opening date for the much-anticipated Techo International Airport in Takhmao. Originally set to open on July 10, 2025, the grand opening is now scheduled for September 9, 2025, as indicated in a notice issued […]

National Road 10 Completed: Enhancing Regional Connectivity

The construction of National Road 10, stretching over 197.36 kilometers, has been officially completed, marking a significant milestone in the region’s infrastructure development. The road is now fully operational and has undergone a thorough inspection by a team of skilled technicians to ensure its longevity and adherence to technical standards. A detailed assessment was conducted […]