Cambodia Needs 1.6 billion SDR to Develop Six Prioritised Sectors in 2022

The Cambodian government would need a total of 1.6 billion SDR (international reserve assets) to develop six prioritised sectors or equivalent to 35 public investment projects in 2022, according to the new Draft Law on Financial Management.

The SDR will be allocated to sectors such as energy (8 projects), irrigation (5 projects), physical infrastructure (7 projects), health (3 projects), education and vocational training (2 projects), agriculture (3 projects), and others (06 projects).

For the physical infrastructure sector, the seven projects include:

1. Construction of the Mekong River bridge and connecting road to Kratie province

2. NR7 expansion (from Skun to Kampong Cham). This project is scheduled to begin soon as the working team is currently wrapping up the study. (Read more)

3. Construction of a new Cambodia-Thailand border checkpoint and connecting road from the border to NR5 Phase 2. As of June this year, the Stueng Bat-Ban Nong Lan international border checkpoint for the Cambodian side was over 21% complete. (Read more)

4. NR5 renovation project for Pursat – Battambang- Sisophon (Credit package, phase 3). To date, the NR5 Battambang – Serey Sophorn section is 100% complete, while the other three sections are on track for completion by 2022, 2023 and 2024, respectively. (Read more)

5. Sustainable renovation project rural roads

6. Construction of Cambodia-Korea Friendship Bridge. South Korean experts are still studying the design and choosing locations for the Chroy Changvar – Svay Chrom Bridge, but no completion timeframe has been given. (Read more)

7. Implementation of Rural Area Resiliency Improvement Projects

Besides the aforementioned projects, from 2022 to 2024, the Cambodian government would also need US$9.2 billion to implement a total of 673 public investment projects, with 44.2% allocated for infrastructure development. (Read more)

- Video Advertisement -

Related Post

A $117 Million Economic Lifeline: Prime Minister Hun Manet Inaugurates Newly Expanded National Road 7

The newly upgraded 4-lane highway connecting Skun and Kampong Cham town is projected to deliver a 15.27% economic return, slashing travel times and boosting agricultural trade… In a major boost to Cambodia’s internal logistics network, a vital 45.489-kilometer section of National Road 7 connecting the Skun roundabout to the Kizuna Bridge roundabout in Kampong Cham […]

Maritime Geopolitical Rivalry Intensifies as Vietnam Accelerates $4 Billion Deep Sea Port Project in the Far South

The massive infrastructure development on Hon Khoai Island serves as both an economic gateway for the Mekong Delta and a strategic maritime shield amid shifting regional dynamics Ho Chi Minh City: The geopolitical and trade landscape of Southeast Asia is entering a highly competitive phase as nations across the region race to build strategic advantages. […]

Field Assessments Underway for Kandal Province New Strategic Bridge

A joint delegation evaluates four potential sites for the Koh Khsach Tonlea crossing to enhance rural connectivity and market access In a significant step forward for Cambodia’s infrastructure development, a multi-institutional technical team has launched a comprehensive field survey to determine the optimal location for the upcoming Koh Khsach Tonlea Bridge project in Kandal Province. […]

Cambodia Completes Major Expansion of National Road 7 Connecting Skun and Kampong Cham

The $117 million infrastructure upgrade backed by China is set for an official inauguration by Prime Minister Hun Manet in July… The extensive upgrade of National Road 7, stretching over 45 kilometers to connect the hub of Skun with Kampong Cham town, has officially reached 100% completion. To mark this infrastructural milestone, a formal handover […]

Cambodia to Upgrade National Road 4 Section in Chbar Mon to Drive Regional Economic Growth

The Kampong Speu Provincial Administration recently announced a comprehensive infrastructure initiative aimed at upgrading the aesthetics and functionality of a key section of National Road 4 within Chbar Mon City. The project is strategically designed to transform the province into a vital economic and commercial center for the region. This development plan was detailed in […]

Bassac Riverbank Stabilization Project in Kandal Reaches 60% Completion

The ongoing infrastructure initiative to reinforce the Bassac riverbank in Sampov Poun City, Kandal Province, has achieved a significant milestone, with construction teams completing approximately 60% of the designated works. Local authorities and engineering crews remain heavily committed to accelerating the remaining phases to ensure the project concludes entirely on schedule. During a recent field […]