Dang Kambit Reservoir Development Project Surpasses 63% Completion in Kampong Thom Province

The Dang Kambit Reservoir Dam construction project in Sre Khsach Village, Sandan District, has reached an impressive 63.2% completion, as confirmed by a recent progress inspection led by H.E. Chuon Bithol, Undersecretary of State at the Ministry of Water Resources and Meteorology.

During the inspection, H.E. Bithol outlined the detailed progress of the project, which is set to enhance water supply and irrigation in the region. Key milestones include:

– Spillway Construction: Phase 1 completed at 100% and Phase 2 at 60%

– Non-Spillway Construction: 55% complete

– Left Earth Dam: Completed at 95%

– Right Earth Dam: 70% complete

– Phase 1 Floodgate: Completed at 100%

The Dang Kambit Reservoir Development Project commenced on December 8, 2023, and is scheduled for completion in October 2027, a timeline of 48 months. The ambitious infrastructure features a 2,680-meter-long dam comprising a 1,136-meter-long earth dam, a 50-meter concrete dam, a 306-meter spillway dam, and a 1,188-meter right earth dam.

Once operational, the project is expected to significantly benefit the local communities, providing irrigation resources to approximately 25,000 farming families, or about 85,300 individuals across Baray, Kampong Svay, Prasat Sambor, Sandan, Santuk, and Stoung districts. It is projected to irrigate around 131,323 hectares of rice fields, enhancing yields from 4 tons to an impressive 5.4 tons per hectare. Additionally, the reservoir will contribute to clean water access and flood mitigation in the area. (Read more)

Financed through concessional loans from the Export-Import Bank of China (EXIMBANK) via the Ministry of Economy and Finance, the Dang Kambit Reservoir project is also classified as a priority initiative in the Finance Law for Management 2023. (Read more)

With this development, the Kampong Thom Province looks forward to a brighter agricultural future and improved water management systems. Stay tuned for further updates as the project progresses.

- Video Advertisement -

Related Post

MPWT and AIIB Review Feasibility Study for National Road 8 Upgrade Connecting Prek Tamak to Ponhea Kraek

High-level technical session examines environmental-social assessments and financial modeling to accelerate a critical transit corridor across eastern Cambodia Phnom Penh: Upgrading Cambodia’s strategic transport corridors gained momentum as government officials and international financial partners reviewed preliminary engineering and environmental evaluations for a vital regional thoroughfare on National Route 8. According to the meeting session on […]

Prime Minister Inaugurates 98-Kilometer Road Network Worth Nearly $44 Million in Northeastern Cambodia

Modernizing National Road 73 alongside Provincial Roads 377 and 377A, the $43.95 million project enhances climate resilience, boosts agro-logistics, and strengthens trade routes across Kratie and Tboung Khmum. In a major boost to northeastern Cambodia’s transport networks, Prime Minister Samdech Thipadei Hun Manet officially inaugurated three upgraded national and provincial road sections in Kratie and […]

Cambodia Advances Strategic Infrastructure Plan with Upgraded National Road 1 and New Mekong River Bridge

Discussions on JICA’s draft final report highlight a 53-kilometer road widening project and an Extradosed Bridge connecting Phnom Penh to Areyksat along the Southern Economic Corridor As Southeast Asian nations continuously upgrade their transport networks to drive economic integration and regional competitiveness, Cambodia is taking significant strides to modernize its core transit corridors. On Wednesday, […]

National Road 7 Expansion Project Nears Completion as Vital Economic Link Reaches 90% Finish

Accelerated construction on the Skun to Kampong Cham corridor aims for early delivery to boost regional trade and transport efficiency The expansion and upgrade of National Road 7, a critical infrastructure project connecting the Skun area to Kampong Cham city, has reached nearly 90% completion as of March 2026. This significant milestone was highlighted by […]

Cambodia Road Network Expands to Over 20,000 Kilometers in 2025

Strategic infrastructure development adds 426 kilometers to the national network to boost logistics and economic growth The total length of developed roads in Cambodia reached 20,733.91 kilometers by the end of 2025, marking a notable increase of approximately 426.32 kilometers compared to the previous year. This data was highlighted in the 2025 Annual Progress Report […]

Cambodia and Laos to Fast-Track Cross-Border Connectivity with New Ratanakiri-Attapeu Road Link

Joint inspection team to finalize construction zones this February to unlock new trade and economic opportunities Cambodia and Laos have reached a pivotal agreement to conduct a joint technical inspection aimed at defining the specific zones for a new road project connecting Ratanakiri province in Cambodia to Attapeu province in Laos. This initiative is a […]